My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:15:12 PM
Creation date
6/3/2020 9:45:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Before placing sump on tank fitting adapters, place <br /> approved backfill between the tank top and sump <br /> bottom. Ensure there will be no backfill voids under The use of approved backfill material is critical <br /> the sump. to long term sump performance. Failure to use <br /> Figure E-2 approved backfill may result in sump failure. <br /> Proper Backfill Installation Improper Backfill Installation • Replace all excavated native soil with approved <br /> backfill of proper sized and gradation. Use backfill <br /> Sump Backfin ° sump Backfill which meets ASTM C-33 for quality and soundness. <br /> • Require your backfill supplier to certify that the backfill <br /> uo meets this specification. <br /> • Keep backfill dry and free of ice in freezing conditions. <br /> • Use only the following approved backfills. <br /> •o •n Air Void Figure G-1 <br /> 7 Right wrong PEA GRAVEL CRUSHED STONE <br /> Tank Fitting Tank Fitting <br /> • Position sump on tank fitting adapters, continue to <br /> place backfill under the sump bottom. <br /> (73/4" 1/2" <br /> • Complete fitting manufacturers installation of tank m) (12 mm) <br /> fitting adapters. <br /> • Before standing in sump or seating lid, place Maximum Size <br /> approved backfill between the tank top and sump Maximum Size <br /> bottom. Ensure there will be no backfill voids under <br /> the sump. 1" <br /> • Complete installation of sump per the installation 3/4r <br /> instructions. <br /> 1 �� <br /> • Keep the sump lid, o-ring and o-ring groove free from 2 <br /> contaminates. 1/4r _ <br /> • When installing lid, apply additional lubricant as <br /> needed. E2,_ <br /> • Step on lid perimeter until lid pops into place and is Pea Gravel: Crushed Stone or Gravel: <br /> properly seated. Clean naturally-rounded Washed,with angular <br /> aggregate with particle particle sizes no larger <br /> INIMMY-11"Im! e • sizes no larger than%" than%"with no more <br /> with no more than 5% than 5%passing a <br /> passing a#8 sieve. #8 sieve. <br /> Dry density must be a Dry density must be a <br /> DO NOT pressure test sump or DO NOT apply more than minimum of 95 pounds minimum of 95 pounds <br /> 25 inches water vacuum to sump enclosure or damage per cubic foot. per cubic foot. <br /> may occur. <br /> Note: If material which meets these specifications <br /> • Fill sump with water at least 3"above highest joint or is not available, contact the Containment Solutions <br /> penetration. Technical Support department for information <br /> • Record the liquid level. on approved alternate materials and installation <br /> instructions. Using other than approved bedding and <br /> • Wait 24 hours. backfill materials without Containment Solutions's <br /> • Re-measure and record the liquid level.A liquid prior written approval will void the sump warranty <br /> change of more than W indicates a possible leak. and may result in sump failure. <br /> • As an alternative, 25 inches water vacuum may ALTERNATE BACKFILL FOR SUMPS -SAND <br /> be applied to the sump. CSI Sump Vacuum Test If the tank is installed in pea gravel, crushed stone, <br /> Procedure for O-ring Top must be followed. The WTL or other porous backfill, a continuous layer of CSI <br /> testable lid must be ordered to perform this test. approved geotextile fabric must be installed at the <br /> tank top prior to backfilling sumps with sand. Refer <br /> to INST 6001 for specific requirements on geotextile. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.