My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:15:12 PM
Creation date
6/3/2020 9:45:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 0 0 Page of <br /> 6. PIPING SUMP TESTING _ <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#1 Sump#2 Sump# Sump# <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 38" 41" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 16" 18" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 12" 12" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' Water Line 18" Water Line 20" _ <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes <br /> product and water)?` <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes <br /> shutdown?` <br /> Was fail-safe verified to be No No <br /> operational?* <br /> Wait time between applying water <br /> 10 Minutes 10 Minutes <br /> and starting test: <br /> Test Start Time: 2:45 2:50 <br /> Initial Reading(Rj): .001 .001 <br /> Test End Time: 3:15 3:20 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or Criteria: .005130 Minutes .005130 Minutes <br /> Test Result. .. _ <br /> I"as F ,F Ii; <br /> _. � Piss_ C1.�'al Pass:: ❑Fail p Pass ❑Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA Yes ❑No ❑NA — ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB,LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.