My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:15:12 PM
Creation date
6/3/2020 9:45:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 40 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT DC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC#1&2 UDC#3&4 UDC#4s UDC# <br /> UDC Manufacturer: Environ Environ Environ <br /> UDC Material: Poly Plastic Poly Plastic Poly Plastic <br /> UDC Depth: 30" 30 '/a" 30 '/a" <br /> Height from UDC Bottom to Top 9" 9" 10" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 8" 11" 12" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to See Comments See Comments See Comments <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?` <br /> Was fail-safe verified to be <br /> operational?* <br /> Wait time between applying <br /> water and starting test <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result. Pass... .0 )i±a.1... ' ss CI FaII ;Pass ❑Fail. ..< Pass ❑Fail <br /> Was sensor removed for testing? Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA X Yes ❑No ❑NA <br /> Was sensor properly replaced and Yes 0 No ❑NA Yes ❑No ❑NA Yes ❑No :1NA X Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> UDC's not Tested with this Testing Event! <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.