My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:15:12 PM
Creation date
6/3/2020 9:45:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m <br /> m <br /> m <br /> Instructions for 4, 8, 10 Installation Instructions-Double Sided Studded Penetration Fittings <br /> 12 Stud Applications Prepare all surfaces to be bonded prior to completing installation steps below.WARNING:Faflu re to follow each step will Vold warranty K <br /> may result in premature failure of penetration fitting.This fitting is UL Listed when Installed In accordance with these instructions using <br /> the following components:DBC Cleaner;DGK Diversified Bonder or Zip-rite Glue Kit.Adhere to the following general instnxtions for each <br /> step ofthe installation: <br /> ®® BONDING TO POLY SUMPS:Clean,sand and rough up sump surfaces.Clean fitting and apply Zip-Trte to all surfaces to be bonded. <br /> ® LISTS BONDING TO FIBERGLAS5 5UMPS:Clean,sand all surfaces to smooth, even surface,then dean with DBC.Remove all gel coat or gluing, <br /> WSW Apply Zip 11te to all surfaces to be bonded. <br /> FLAMMABLE F A°o°MBusrtM vats TaWaccessMES CLEANING:Spray all surfaces to be bonded with OBC Cleaner and allow to air dry or excess cleaner may be wiped off using a clean dry <br /> aa.e a Yanaar <br /> STEP STEP STEP 3 STEP 4 <br /> LO Sump Preparation.Where possible nun pipe Center and clamp front plate to sump Dry fit the fittings.Ifyou have,trouble fitting Apply Zip-rite bonder to faoes of fittings. <br /> W so as to penetrate the sump perpendicular to wall. Mark hole positions and drill them together,recheck your holes,you may Work bonder into grooves to ensure complete <br /> ry sump surfhoc.Drill oenter hole according to with 5/16"drill.On round sumps need to clean them out with ttue drill.Studs ooverage. <br /> nelmn.Sand around hole 21/2"on both sides make sure you drill perpendicular to must fit f mij%,through holes. install stud seals <br /> W of strop. the sump wall. <br /> z <br /> W <br /> W <br /> —j Steed Hie tCseSpzeiog RIAKF <br /> Hie &loe�e r _ SURE THE <br /> CORRECT _lk=It' <br /> 4D 2 A" 4.75" IFFTT �-- - — <br /> $D 4" 6.50" TSO THF <br /> 10D S%i" 8.35' OIsrSIDEOF I A _ - _ .<::- -- •t'@S <br /> 12D 6-1/s" M" TETE SMW - -- Y <br /> S <br /> STEP 5 STEP 6 <br /> After installing the Interior(Studded) Install pipe and tighten band clamps_ Do not exceed 60 inch TOOLS REQUIRED <br /> plate,install the Stud seals and then pounds. <br /> 1} Appropriate Hole Saw <br /> the exterior plate and finger tighten the <br /> LO 2) 5/16"Nittdriver-(Band Clamps) <br /> LD Stud nuts.Tighten until boot is snug to <br /> interior wall. 3} 1 f2"Deep socket-(Stud Nuts) <br /> m <br /> m - <br /> m � - <br /> c' _ PRODUCTS NEEDED <br /> =- - DBCCleaner <br /> LO - Zip-T-tte Bonder(Glue)-used for all sump types <br /> u-i <br /> Zip-Tlte Packag Ing Option s <br /> DGK-4(Formally DGK)iso oz container <br /> _' DGK-16(Formally DRB III)Is 16 oz container <br /> N , <br /> m <br /> a-1 <br /> � • r <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.