Laserfiche WebLink
UST SYSTEM DRAWING INFORMATION <br />w <br />1. <br /># ( <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /># <br /># <br />CAPACITY <br />2. <br />`01000 <br />Plans drawn to scale in non -erasable print. <br />3. <br />MANUFACTURER <br />Plot plan to show location of tanks and all associated piping. <br />4. <br />✓• <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />5. <br />-r <br />Tank cross-sectional diagram. <br />6. <br />Detail of tank, associated piping, excavation and cover. <br />DW T <br />PWT 11 PW -r IT <br />7. <br />PRODUCT <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br />m & MGULAR <br />Article 3, Section 2631 (b) & 26357 <br />CORROSION PROTECTION <br />/ <br />FR DI/ FRP <br />Verification of product compatibility with the tank(s), piping, monitoring <br />1-61 to <br />or <br />H �3 <br />-device(s), epoxy or silicone glues, etc. <br />COMPATIBILITY WITH 100% <br />METHANOL <br />vac���� <br />9. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />At the installation site, prior to installation, a tightness test shalt be performed on both primary (1°) and <br />secondary (2°) containment systems before covering. [Section 2635 (a) (3) & (4)} <br />11. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />submitted directly to PNS-EHD from the testing company or owner of facility. [Health & Safety Cale, Division 20, <br />Chapter 6.7, Section 25291.(h)) <br />12. <br />TANK COMPOSITION <br />TANK # <br /># ( <br /># S # 3 <br /># <br /># <br />CAPACITY <br />[0100 [7 <br />`01000 <br />MANUFACTURER <br />i< C;17 <br />q�0,4D®0 <br />/� <br />COMPOSITION <br />-r <br />p <br />F -P -p t <br />MODEL <br />DW T <br />PWT 11 PW -r IT <br />PRODUCT <br />wM <br />m & MGULAR <br />CORROSION PROTECTION <br />DW P <br />FR DI/ FRP <br />U.L. LISTED <br />1-61 to <br />or <br />H �3 <br />COMPATIBILITY WITH 100% <br />METHANOL <br />vac���� <br />13. TANK(s) TO BE INSTALLED <br />A. Steet-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metaltic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance hot iday- detector. <br />(2) Vacuum applied to interstitial space. <br />B. Fiberglass <br />!e� (1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank [Section 2635 (a) (2) (A)3 <br />— (1) Cathodic protection provided for entire tank, piping and components (ruts, bolts, washers, <br />etc.). <br />(2) Field installed cathodic protection systema designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />5 <br />