Laserfiche WebLink
�J <br />NOTE: Your tank will arrive with a Quick Disconnect aSS8016 ;C-- `cure 2-3 <br />00) unless you have a liquid -filled interstitial space canis. It th : V -11I is not <br />conngured as shown in the illustration prior to pre-insmlationw.niir^g, he <br />Xerxes Coorcinator at the plant nearest you or the Technical "ces <br />Department at Xerxes' headquarters. <br />QUICK DISCONNECT ASSEMBLY <br />NOTE: In order to test the primary tank alone, the :est hose) Ttsac NoT ie <br />connected to the service fitting - keep the nylon tie in place. <br />PRIMARY (INTERNAL) TANK TEST <br />1. Connect the test manifold to an available serviWEl'1ltting. <br />Remove the remaining fittings, redope, and re6e—=t litm <br />plugs. <br />2. Pressurize the primary tank to 5 PSIG: add or SVrcve air a.s <br />necessary and allow the pressure to stabilize. :s.athe vaave <br />on the test manifold supply line. <br />3. Monitor the pressure for one hour. Soap test ai :9s10 a flogs <br />and manways. Watch for active air bubbles wttl;. indicat~a <br />leak. <br />______, NYLON TIE <br />i �—pgESSI�tE REL:.. I:TcY1C_ <br />\ ?OM C01P�°aaF1R <br />9UICK DISCONNECT /'-AIR i�9'�.Y vAL/E <br />ASSEMBLY AIR'. , ;AUvrt <br />MONITOR FITTING ^=: "rnlo <br />SECONDARY (EXTERNAL) TANK TESM <br />1. Maintain the pressure in the primary tank <br />2. Free the hose from the service fitting by cattinc Ul. milon I e. <br />3. Insert the hose into the Quick Disconnect chem- `-eve (fob at <br />the top of the service fitting). This Mil allow airmetlaransw tom <br />the primary to secondary tank <br />4. Pressurize to 5 PSIG. Add or remove air via "!! Qiy valve <br />as needed and allow the pressure to 3-Miiize. ase fire VAve <br />on :he test manifold. Disconnect the air supplyiit . <br />5. Monitor the pressure for one hour. Soap the ease, exterior of <br />the rank and watch for active air bubbles which ,,mdcme a ,eak. <br />When the test is complete, carefully release the sk zre=refrom <br />the *ank by opening the supply valve. i ne air sup=r* "inti alreWY <br />shouic have been disconnected. When ate air flow -vrm ate <br />supply valve stops, remove the test manifold. <br />2C. DOUBLE WALL TANK WITH LIQUID-FILLED;(WET) <br />INTERSTI ` nSAL SPACE <br />PRIMARY (INTERNAL) TANK TEST <br />NOTE: Keep the tank vertical (the reservoir on top) during the preinstallation <br />testirig or the Squid (typically brine) may drain from the reservoir. <br />1. Open one service fitting and the fitting on the reservoir. Check <br />for liquid in the reservoir - it should be about half full. Do not <br />open the monitor fittings - liquid (typically brine) will be lost. <br />Remove the remaining fittings, redope, and reinstall fitting <br />plugs. <br />2. Visually check the interior of the tank for liquid - there should <br />not be any. Install the test manifold in the open service fitting. <br />Connect the pressure source to the test manifold. (See Figure 2-4). <br />3. Pressurize the primary (internal) tank to 5 PSIG. Add or remove <br />air as necessary and allow the pressure to stabilize. Close the <br />valve on the test manifold. Disconnect the air supply line. <br />4. Monitor the pressure for one hour. Soap ail fittings and <br />nanways and watch for active air bubbles which indicate a <br />leak Check the reservoir for bubbles in the monitor fluid. <br />5. Release the pressure from the primary tank. <br />I <br />i FROM COMPRESSOR <br />PRESSURE RELIEF DEVICE <br />AIR gJpPLY vALVE RESERVOIR FITTING <br />AIR SUPPLY GAUGE <br />SERVICE FITTING <br />i <br />I <br />I <br />3 <br />r r � <br />i1\ CAUTION: <br />Do not premrize the secandary tank (interstitial space) or the <br />pnvary tank may rupture and cause tank failure. <br />Chem the exterior of the tank for monitoring liquid - if liquid is <br />found, wipe the tank dry and verify that the liquid does not <br />reappear. Lift the tank to check the bottom. Do not roll the tank. <br />/I\ DANGER: <br />0o not stand under the tank while it is being lifted. <br />When the testis complete, remove the test manifold. Visually <br />check the interior of the tank for liquid. Replace the protective <br />covers in :he service fitting and the reservoir fitting. <br />