Laserfiche WebLink
SWRCB, January 2002 <br />0 0 Page 4. <br />6. PIPING SUMP TESTING <br />Test Method Developed By: F-1 Sump Manufacturer ❑ Industry Standard X❑ Professional Engineer <br />El Other (Specify) <br />Test Method Used: ❑ Pressure F Vacuum Xl Hydrostatic <br />n Other (Specify) <br />Test Equipment Used: vPlt <br />Equipment Resolution: vplt to gph <br />Sump # 3 UNL <br />Sump # 2 PLU <br />Sump # 1 SUP <br />Sump # <br />Sump Diameter: <br />4811 <br />4811 <br />4811 <br />Sump Depth: <br />56" <br />56" <br />56" <br />Sump Material: <br />fiberglass <br />fiberglass <br />fiberglass <br />Height from Tank Top to Top of <br />1511 <br />1511 <br />1511 <br />Highest Piping Pentration: <br />Height from Tank Top to Lowest <br />1211 <br />1211 <br />1211 <br />Electrical Pentration: <br />Condition of sump prior to testing: <br />good <br />good <br />good <br />Portion of Sump Tested: 1 <br />17 It <br />1711 <br />1711 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />ElYes [:]No[:]N <br />MYes [:]No[::]N <br />E]Yes [:]No[::]N <br />[]Yes ❑Noa <br />product and water)?* <br />Turbine shutdown response time: <br />2 - 5sec <br />2 - 5sec <br />2 - 5 s e c <br />Is system programmed for fail-safe <br />X Yes N N <br />❑ ❑ � <br />X Yes N N <br />❑ ❑ � <br />X Yes N N <br />❑ ❑ � <br />X Yes No <br />❑ � <br />shutdown?* <br />lav <br />Was fail-safe verified to be <br />XMYes DNoONA <br />x❑Yes [::]No❑N <br />Yes ONo[::]NA <br />E Yes No[:]N <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and starting <br />5min <br />5min <br />5min <br />test: <br />Test Start Time: <br />9:21 <br />9:24 <br />10 : 27 <br />Initial Reading (Rl ): <br />8.093 <br />1.847 <br />6.241 <br />Test End Time: <br />9; 51 <br />9; 54 <br />10 : 5 7 <br />Final Reading (RF ): <br />7.996 <br />1.847 <br />5.893 <br />Test Duration: <br />3 Omin <br />3 Omin <br />3 Omin <br />Change in Reading (RF- Rl ): <br />. 007gph <br />. 000gph <br />. 03gph <br />Pass/Fail Threshold or Criteria: <br />. 05gph <br />. 05gph <br />. 05gph <br />Was sensor removed for testing? <br />X Yes N NA <br />MEN= <br />X Yes N NA <br />Yes N NA <br />Yes ]NoaA <br />Was sensor properly replaced and❑ <br />functional <br />X Ye N NA <br />X Ye <br />❑ N NA <br />X Ye � N � NA <br />❑ Yes N <br />verified after testing? <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any f the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />