Laserfiche WebLink
SWRCB, January 2002 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Page 5. <br />Test Method Developed By: ❑ UDC Manufacturer Industry Standard X� Professional Engineer <br />El Other (Specify) <br />Test Method Used: FI Pressure Vacuum El Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: vplt <br />UDC# 1/2 UDC# 3/4 <br />UDC Manufacturer: unknown unknown <br />Equipment Resolution: vPlt to gph <br />UDC# 5/6 UDC# 7/8 <br />unknown unknown <br />UDC Material: <br />fiberglass <br />fiberglass <br />fiberglass <br />fiberglass <br />UDC Depth: <br />30" <br />30" <br />30" <br />30" <br />Height from UDC Top to Top of <br />Highest Piping Pentration: <br />11.511 <br />11.511 <br />11.511 <br />11.51" <br />Height from UDCTop to Lowest <br />Electrical Pentration: <br />211 <br />211 <br />211 <br />211 <br />Condition of UDC prior to testing: <br />good <br />good <br />good <br />good <br />Portion of UDC Tested: i <br />13.511 <br />13.511 <br />13.511 <br />13.511 <br />Does turbine shut down when <br />sump sensor detects liquid (bothX❑yes <br />product and water)?* <br />❑No❑N <br />Yes ❑No❑N <br />Yes ❑N�N <br />M Yes ❑No�1 <br />Turbine shutdown response time: <br />2 - 5sec <br />2 - 5sec <br />2 - 5sec <br />2 - 5 s e c <br />Is system programmed for fail-safe <br />shutdown?* <br />X Yes N N <br />1:1❑ <br />X ❑ N <br />Yes N <br />7--'Y Y <br />X es N N <br />❑ � <br />X Yes NoL_IN <br />❑ ❑ <br />Was fail-safe verified to be❑ <br />operational?*X <br />Yes N N <br />❑ � <br />X Yes N N <br />❑ � <br />X Yes N N <br />❑ ❑ � <br />❑ �T <br />X Yes No <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5min <br />5min <br />5min <br />5min <br />Test Start Time: <br />10:04 <br />11:15 <br />11:05 <br />10:58 <br />Initial Reading (Rl ): <br />3.674 <br />4.10 3 <br />5.026 <br />3.296 <br />Test End Time: <br />10;19 <br />11:30 <br />11:20 <br />11:13 <br />Final Reading (RF ): <br />3.661 <br />4.000 <br />5.026 <br />3.296 <br />Test Duration: <br />15min <br />15min <br />15min <br />15min <br />Change in Reading (R F - RI ): <br />. 0 0lgph <br />. 0lgph <br />. 0 0 0gph <br />. 0 0 0gph <br />Pass/Fail Threshold or Criteria: <br />. 05gph <br />. 05gph <br />. 05gph <br />. 05gph <br />Was sensor removed for testing? I uYes N NA X lYesL_jNoL_JNAI uYesLJN NA X Yes No A <br />Was sensor properly replaced and jE]YeC]NcE]NA�F77_1X Yes0N NA❑ YesDN�NA X❑yes ❑N`_JNA <br />verified functional after testing? <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to -any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />