Laserfiche WebLink
JP Petroleum Service <br />0 <br />SWRCB, January 2002 <br />9163724873 P.6 <br />Page _ <br />of <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Caldwell Systems Equipment Resolution:.005/30 min <br />UDC # 1&2 UDC # 3&4 UDC # 5&6 UDC # 7&8 <br />UDC Manufacturer: Western <br />Western <br />Western <br />Western <br />UDC Material: Fiber lass <br />Fiber lass <br />Fiberglass <br />Fiberglass <br />UDC Depth: 24" <br />24" <br />24" <br />24" <br />Height from UDC Bottom to Top 11" <br />of Highest PipjqE Penetration: <br />11" <br />10" <br />10" <br />Height from UDC Bottom to 7" <br />Lowest Electrical Penetration: <br />7" <br />7" <br />7" <br />Condition of UDC prior to Dry <br />testing: <br />Dry <br />Dry <br />Dry <br />Portion of UDC Tested 2" above <br />Highest <br />PipLn& <br />penetration <br />Does turbine shut down when <br />UDC sensor detects liquid (both x Yes ❑ No ❑ NA <br />rc duct and water)?` <br />x Yes ❑ No [INA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown? x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />Was fail-safe verified to be ❑ yes x No ❑ NA <br />o rational?' <br />❑ Yes x No ❑ NA <br />❑ Yes x No ❑ NA <br />❑ Yes x No [INA <br />Wait time between applying <br />pressure/vacuum/water and 5 min <br />starting test <br />5 min <br />5 min <br />5 min <br />Test Start Time: I2:20 <br />12:30 <br />12:10 <br />10:40 <br />Initial Readm (RI): .00" <br />.00" <br />.00" <br />.00" <br />Test End Time: 12:50 <br />1:00 <br />12:40 <br />11:10 <br />Final Reading (RF): .00 <br />.00 <br />.00 <br />.0025 <br />Test Duration: 30 min <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF -RI): .00 <br />.00 <br />.00 <br />.0025 <br />Pass/Fail Threshold or Criteria: .005/30 min <br />.005/30 min <br />.005/30 min <br />.005/30 min <br />Test Result: x Pass ❑ Fail <br />x Pass ❑ Fail <br />x Pass ❑ Fail <br />x Pass ❑ Fail <br />Was sensor removed for testing? x Yes ❑ No Q NA <br />x Yes O No ❑ NA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />Was sensor properly replaced and I x Yes ❑ No ❑ NA <br />verified functional after testing? <br />x Yes ❑ No ❑ NAx <br />Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing; and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to My of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />