Laserfiche WebLink
Mar OP 09 07:23a JP Pet oleum Service 916372 873 p.5 <br />SWRCB, January 2002 Page of <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer O Industry Standard X Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br />Comments — (include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. 1f the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />Sump # i <br />Sump # 2 <br />Sump # 3 <br />Sump # <br />Sump Diameter: <br />42" <br />42" <br />42" <br />Sump Depth: <br />46" <br />46" <br />47" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />18" <br />17" <br />17" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />16" <br />17" <br />16" <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Dry <br />Portion of Sump Tested` <br />2" above <br />Highest piping <br />penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />x Yes ❑ No <br />❑ NA <br />x Yes O No O NA <br />x Yes O No <br />O NA <br />❑ Yes O No <br />0 NA <br />Turbine shutdown response time <br />Is system programmed` for fail-safe <br />shutdown? <br />x Yes O No <br />0 NA <br />x Yes 11 No O NA <br />x Yes ❑ No <br />❑ NA <br />❑ Yes ❑ No <br />❑ NA <br />Was fail-safe verified to be <br />operational?* <br />0 Yes x No <br />O NA <br />❑ Yes x No ❑ NA <br />❑ Yes x No <br />❑ NA <br />0 Yes 0 No <br />O NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5 min <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />9:40 <br />10:10 <br />10:50 <br />Initial Reading (Ri): <br />00" <br />.00" <br />.00" <br />DO" <br />Test End Time: <br />10:10 <br />10:40 <br />11:20 <br />Final Reading (RF): <br />.00 <br />.00 <br />.00 <br />Test Duration: <br />30 min <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF-Ro- <br />.00 <br />.00 <br />.00 <br />Pass/Fail Threshold or Criteria: <br />.005/30 min <br />.005/30 min <br />.005/30 min <br />.005/30 min <br />Test Result: <br />x Pass ❑ Fall <br />x Pass ❑ Fail <br />x Pass 0 Fail <br />O Pass 0 Fail <br />Was sensor removed for testing? <br />x Yes ❑ No <br />❑ NA <br />x Yes ❑ No ❑ NA <br />x Yes O No <br />❑ NA <br />0 Yes ❑ No <br />❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />x Yes 0 No <br />❑ NA <br />x Yes O No O NA <br />x Yes ❑ No <br />❑ NA <br />O Yes ❑ No <br />❑ NA <br />Comments — (include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. 1f the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />