My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 2:51:09 PM
Creation date
6/3/2020 9:45:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRC% January 2002 is ONDARY P11PE TESTING 0 Page of <br />5. SEC <br />Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: X Pressure El Vacuum 0 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: Pressure Gauge <br />Equipment Resolution: 0-15 PSI <br />IS Mll. 1"I"EM <br />. . .... I M <br />M <br />, I <br />Piping Run # 1 <br />Piping Run # 2 <br />Piping Run # 3 <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />311 <br />31' <br />Length of Piping Run: <br />150, <br />150' <br />150, <br />Product Stored: <br />Regular <br />Plus <br />Premium <br />Method and location of <br />piping -run isolation: <br />Test boot <br />Test boot <br />Test boot <br />Test boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />9:10 <br />8:40 <br />8:35 <br />Initial Reading (RI): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />10:10 <br />9:40 <br />9:35 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />30 min <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF -RI): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 drop <br />0 drop <br />0 drop <br />0 drop <br />Test Result: <br />x Pass 0 Fail <br />x Pass 0 Fail <br />x Pass 0 Fail <br />0 Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.