Laserfiche WebLink
UNDER DISPEAER CONTAINMENT POC TESTING <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: o Pressure o vacuum • Hydrostatic o Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Disp#112 Disp#314 Disp#5/6 Disp#7/8 <br /> UDC manufacturer Bravo Bravo Bravo Bravo <br /> UDC material Steel Steel Steel Steel <br /> UDC depth (inches) 9" 9" 9" 9" <br /> Height from UDC bottom to highest Bottom Bottom Bottom Bottom <br /> piping penetration <br /> Height from UDC bottom to lowest Bottom Bottom Bottom Bottom <br /> electrical penetration <br /> Condition of UDC prior to testing Dry Dry Dry Dry <br /> Portion of UDC tested Entire Entire Entire Entire <br /> Type of shut-down present Float Float Float Float <br /> Was sensor removed for testing? N/A N/A N/A N/A <br /> Was sensor properly replaced after testing? N/A N/A N/A N/A <br /> Depth of water level from UDC bottom (in.) 6" 6" 6" 6" <br /> Wait time for water level to stabilize (hr:min) 0:10 0:10 0:10 0:10 <br /> Test start time 1:37 PM 11:52 AM 11:52 AM 11:52 AM <br /> Initial Probe Reading 1.1351 1.2405 0.6983 2.3161 <br /> Test end time 1:52 PM 12:07 PM 12:07 PM 12:07 PM <br /> Final Probe Reading 1.1359 1.2407 0.6977 2.3156 <br /> Test duration (hr:min) 0:15 0:15 0:15 0:15 <br /> Change in water level (±0.0000 inches) 0.0008 0.0002 -0.0006 -0.0005 <br /> Pass/Fail threshold (±0.0020 inches/;Hr.) 0.0020 0.0020 0.0020 0.0020 <br /> TEST RESULT PASS PASS PASS PASS <br /> Comments: <br /> © 2006 Walton Engineering,Inc. <br />