My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:06:45 PM
Creation date
6/3/2020 9:46:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification-P of 3 <br /> Site Address: 2701 March Ln.a 1-5 Date of Testing/Servicing: 3118109 <br /> D. Results of Testing/Servicing <br /> Software Version Installed. 329.01 <br /> Complete the foil ing checklist: <br /> •Yes a No* Is the audible alarm operational? <br /> la Yes O No* Is the visual alarm operational? <br /> 1a Yes ® No* Were all sensors visually inspected,fimctional!X tested,and confirmed operational? <br /> M Yes a No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> •Yes a No* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g.modem) <br /> 0 N/A o rational? <br /> is Yes 13 No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> 0 N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) 1a Sump/Trench Sensors; ® Dispenser Containment Sensors. <br /> Did Zou confirm positive shut-down due to leaks and sensor failure/disconnection? M Yes ®No <br /> Q Yes 0 No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> 0 N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating pro!!! If so,at what percent of tank i does the alarm tri er? 90 % <br /> •Yes* 17 No Was any monitoring equipment replaced?If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> •Yes* Q No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> 0 Product;D Water. If yes,describe causes in Section E,below. <br /> 11 Yes 13 No* Was monitorm s stem set-up reviewed to ensure proper settings? ,4ttach set-u r1ports, i a licable <br /> 1a Yes 0 No* Is all monitoring equipment o rational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: 87, 91 & Diesel Leak Detectors failed. Ordering Red Jacket Leak Detectors to replace. <br />
The URL can be used to link to this page
Your browser does not support the video tag.