Laserfiche WebLink
Monitoring System Certification-P0 of 3 <br /> Site Address: 2701 March Ln. 1-5 Date of Testing/Servicing: 3118109 <br /> F. In-Tank Gauging/SIR Equipment: m Check this box if tank gauging is used only for inventory control. <br /> ® Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com tete the follo ing checklist: <br /> a Yes ® No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> O Yes a No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> D Yes O No* Was accuracy of system product level readings tested? <br /> O Yes ® No* Was accuracy of system water level readings tested? <br /> O Yes a No Were all probes reinstalled properly? <br /> E3 Yes ® No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): O Check this box if LLD's are not installed. <br /> Com fetethe fol I ine checklist: <br /> M Yes a No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> 13 N/A (Check all that apply) Simulated leak reate:M 3 g.p.h.(1.); a 0.1 g.p.h.(2.); O 0.2 g.p.h.(2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local gSng,certification required on for electronic LLD start-u . <br /> 0 Yes M No* Were all LLD's confirmed operational and accurate within MElatory Muirements? <br /> M Yes 0 No* Was the testin !2paratus ro erl calibrated? <br /> 0 Yes M No* For mechanical LLD°s,does the LLD restrict product flow if it detects a leak? <br /> a N/A <br /> O Yes 0 No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> M N/A <br /> 13 Yes 0 No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> M N/A or disconnected? <br /> ❑Yes 13 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> M N/A malfunctions or fails a test? <br /> ®Yes ® No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> tE N/A <br /> 17 Yes I M No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: All Leak Detectors failed.Replaced Diesel-would go into slow flow,but would not reset without <br /> shutting off turbines.Ordered Red Jacket Leak Detectors for all turbines. <br />