Laserfiche WebLink
F UNIFIED PROGRAM CONSOLIDATED FORW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAIN )MONITORING <br /> a�-sas <br /> I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54b <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER S <br /> PANEL MANUFACTURER: a9ass MODEL#: 490-56. <br /> -58 <br /> LEAK SENSOR MANUFACTURER: 49"1 MODEL#{S): 490 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a YES .NO 490.60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES 19b.NO 49o-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES ❑b.NO 49x62 <br /> 2.UDC CONSTRUCTION IS M 1.SINGL&WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 4 a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LI UID 2.PRESSURE Q3.VACUUM1 <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 49"4b <br /> VII.PERIODIC SYSIMM TESTING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-,63 <br /> MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2544.1 <br /> 2.SECONDARY CONTAINMENTCOMPONENTS ARE TESTED EVERY 36 MONTHS. 49066 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 49067 <br /> VIII.RECO PING <br /> The following mpnitaringlqutintenance records are kept for this facility: <br /> Alarm lags 490.654 Visual Inspection Room* 49"n Tank integrity resting results 4ww <br /> SIR testing results(and supporting documentation records). 490-6sa Q Tank gauging results(and supporting documentation records). 4"-696 <br /> ATG Testing results(and supporting documentation records).49a4sr U Corrosion Protection 60-day logs 49asss <br /> Equipment nuuntenance and calibration records. 49o-ea <br /> IX.TRAINING <br /> ®Personnel with UST monitoring responsibilities ane familiar with all of the following docuamts relevant to their job duties. 49a69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY'(Check all do any) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Rquired)49"% <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)ml, <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49o-69d <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 49a*& <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49as9r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"496.699 <br /> [� OTHER(Specify):m6w M6% <br /> 10 This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> e-`Designated UST Operatoe,will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's roe with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employce's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact persons)for emergencies and monitoring alarms.49a70 <br /> X. CO /ADDITIONAL TION <br /> Provide additional comments here or ind' how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> XL PFJtSOMCL RUPONSIMITM <br /> The UST OwnerlOperstor is responsible for wring that:1)the daily/routine UST monitoring activities and maintena ee of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a passible release are investigated,and 3)all monitoring records are maintained properly. <br /> The foil "ng persons)are Mible performing the monitoring and equipment trutin e <br /> NAME 49x72 TITLE 490-73 <br /> NAME 49o-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the ownedoperamr,and inform the owner/opemtor of any <br /> conditions that need follow-up action. <br /> XILOWNEWOPERATORSIGNATM <br /> CE KATION:I caky that infrnmation Mvided herein is true and ac=M to the best of m know[ed . <br /> APP IC SIGNATURE 49w6 DATE: 490-77 <br /> APPLICANT NAME(print): 490-79 APPLICANT TITLE: 490.79 <br /> 10 PV Uj <br /> UPCF UST-D(12/2007)3/4 <br />