Laserfiche WebLink
0 w% <br /> UST Mosiltering Plan-pap i Instructions <br /> a <br /> Complete a separate UST Monitoring Plan for each UST monitoring system at the facility. This form must be submitted with <br /> Application and within 30 days of ch in the In tahst.tion it conPlanta note that your keel your Initial UST Operating Permit <br /> modifying monitoring t. (Note: Nu ng of these i instructions follows the data numbers moY I°u m obtain approval BEI9E o installing or <br /> on the form <br /> 490-1. TYPE OF ACTION-Check the appropriate lox to indicate why this plan is beim d,submitte ) <br /> 490-2. PLAN TYPE-Check the appropriate box to indicate whether this plait covers all,or merely sonic,of tie USTs at the fie lity. If the plan covers only some of the tanks, <br /> identify those tanks in the space provided[e.g.,by using the Tank ID#(s)in item 432 of the UST <br /> 1. FACILITY ID NUMBER-This Operating Permit Application-Teak Information Form(s)]. <br /> is for use only. <br /> 3. BUSINESS NAME-Enter the complete Facility Name. <br /> 103. BUSINESS SITE ADDRESS-Enter the street where the facility is luted,including building number,if applicablc.Post office box numbers are not acceptable <br /> This information mmast provide a means to boats the facility geographically. <br /> 104. CITY-Enter the city or unincorporated arca in which the facility is <br /> 490.3a MONITORING EQUIPMENT IS SERVICED-Check theappropriatebox to specify theg/ <br /> 490-3b Slfy Older frequency for monitoring equipmentfrequ®noY off mot»todng aluiptxttt testis certification. <br /> 490-4 SITE PLAN-Indicate if a site planlimp is submitted with this monitoring plan or if it was submitted Levi <br /> a Site Piot P the tank and piping! afld the locations where mail � . t°�Y anted is curtest for the f�ility.Monitoring plans must invade <br /> control panel,eta.), t6Tia8' Pefo�td(i.e.,location of probes,line leak detectors,monitoring system <br /> 490.5 IV-i CONITMTOUS ELECTRONIC MONITORING-hWicate ifthis monitoring method is being used to monitor the tanks. <br /> 490.6 SECONDARY CONTAINMENT-IfIV-1 is checked,check the appropriate box to describe the environment inside the tank secott <br /> 490.7 PANEL MANUFACTURER--if IV-1 is checked,enter the name of the mornifitcuner of the monitorin �'containment. <br /> MODEL#-If IV-i is checked,enter the model for the monitoring system control panelB system control panel(console). <br /> . <br /> 490.9 LEAK SENSOR MANUFACMMM-IfIV-1 is checked,enter the name of the ttrmwfactuter of the samor(s)If additional space is needed,use Section X. <br /> 490-10 MODEL#(S)--IfIV-1 is checked,enter tte model number for each"of sensor insWIal.If additional space is needed,use Section X. <br /> 490-11 IV-2 AUTOMATIC TANK GAUGING-Indicate ifthis is used for tie Ute•& <br /> 4 -12 PANEL MANUFACTURER-IfIV-2 is checked.enter de ofthe ofthemonitoring system amtrol <br /> 490-13 MODEL#-If IV-2 is chucked,enter the model number for the monitoring control panel. <br /> panel(come) <br /> 490.14 IN-TANK PROBE MANUFACTURER-IfIV-2 is checked,enter the now of the manufacul r of the probe(s). <br /> 490.15 MODEL#(S)-IfIV-2 is checked,enter the model number for each tyle of in-tank probe installed.If additional space is <br /> 490-16.LEAK TEST FREQUENCY-IfIV-2 is checked,chuck the appropriate box to describe the iratsnk leak test fregtuncy. wed,use Section X. <br /> 490.17.SPECIFY-If490-16e is checked,enter the <br /> 490-18.PROGRAMMED TESTS-IfIV-2 is odor frequency of i tests. <br /> 490 19,SPECIFY-If 490-18c is �'chi the appropriate box Y0 be�t programmed into the ATG system. <br /> checked,enter the fhequency of in-tank leak testing. <br /> 490.20.IV-3 INVENTORY RECONCILIATION-Check the box ifstatisticai !memory reconciliation is performed. <br /> 490-2I.IV-4 WEEKLY MANUAL TANK GAUGING. us <br /> ifthis method is ed to monitor the tanks. <br /> 490.22.TESTING PERIOD-IfIV-4 is checked,check the appropriate box to describe the MPG test <br /> ng period. <br /> 490.23.IV-5 TANK INTEGRITY TESTING:Indicate ifthis method is used to monitor the tanks. <br /> 490-24.TEST FREQUENCY-IfIV-5 is checked,check the appropriate box to describe the <br /> 490.25.OTT EER:If 490-24c is cluck of tank integrity testing, <br /> ed,specify other test fraluerey_ <br /> 490.26.IV-99 OTHER:Indicate if monitoring of the tanks occurs cat is not indicated in any other <br /> 490.27.IfIV-99 is checked,enter a brief n of t e other tank ) category. <br /> 23CCR§2648). Include the method(s)I f) (e.g.,space umbo tore monitoring per 23 CCR¢2647,groundwater monitoring per <br /> 490-28. div CO MONITOmmRING OF pIPE/P(IPING SUMPS)AND O EER SECCO ARY CONTAINMENT WITH AUDIS LE AND VISUAL ALARMS: <br /> Indicate if this is the mooitorie�method used for the piping. <br /> 490.29.SECONDARY CONTAINMENT:If V-1 is checked,Check the <br /> appropriate 490.30.PANEL MANUFACTURER-If V-i is chocked,enter the name of the manufacturer o of the monitodn describe the envinment sande PiPin$secondary�ntaitnrum <br /> 490-3I.MODEL#-If V-1 is clerked,enter rte model number for the monitor! g system control panel(console). <br /> 490-32.LEAK SENSOR MANUFACTURER-If V-1 is checked,enter the name o system <br /> control panel. <br /> 490-33.MODEL#(S)-if V-1 is checked,enter the model number for each ofinstalled.If of thewndhcttffcr r(c <br /> 490.34.PIPING LEAK ALARM T RIGGERS AUTOMATIC PUMPS WN-If V-1 isd,check space is needed,use Section X. <br /> ea or No. <br /> 490-35.FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN-If V-1 is checked,cluck Yes or No. <br /> 490.36.V-2 PIPE MECHANICAL LINE LEAK DETECTORS PERFORM 3 OPH LEAK TESTS:indicate if this monitoring method is used c mom check <br /> tic pilar No.. <br /> 490.37,MLLD MANUFACTURER(S)-If V-2 is checked,enter the names)ofthe manufaotu-(s)of du rmeolamdoai line leak <br /> Section X. r(s).If additional space is needed,use <br /> 490 38.MODEL#(s)-If V-2 is checked,Enter the model number for each of <br /> irsichanical 490.39.V-3 PIPE ELECTRONIC LINE LEAK DETECTORS:Indicate if this monitoring duncod e!usedtoo= monitor tinstaheme if rnOHc space is needs!,use Becton X. <br /> 490.40.ELLD MANUFACTURER-If V-3 is checked,Enter the of the man tectortes. <br /> 490-41.MODEL#(S)n- If V-3 is checked,enter the model number for each of lite electronic tine leak detector ties. <br /> appropriate <br /> 490-42.PROGRAMMED LINE INTEGRITY TESTS If V 3 is c cluck Clea mniic lm�ne describe detector�led.if sly is use Section X. <br /> 490-43.ELLD DETECTION OF A PIPING LEAK TRIGGERS PUMPS WNto_ type oftests programmed into the monitoring systeIfV_Im <br /> 490-44,ELLD DETECTION OF A PIPING LEAK FAILURE 4DISCONNECTION TRIGGERS PUMP SMHDcbeckOWNYes <br /> y I i Mcleoked,check Yes or No. <br /> 49045.V-4 PIPE INTEGRITY TESTING-Indicate ifthis monitoring method is to monitor du i <br /> 490-46.TEST FREQUENCY-If V-4 is clacked check the ate box to. be the p pd�s. <br /> 490.47.SPECIFY-If 490.46-99 is clucked,enter the9neacY of Irk integrity testing <br /> 490.48.V-5 VISUAL PIPE MONITORING �9 Y ofpi�itending, <br /> - I if this monitoring method is used to monitor the pipelines. <br /> 490.49.If V-5 is checked,cluck the appropriate sox to describe thetoncy <br /> 490-50.SUCTION PIPING MEETS EXEMPTIONCRTTERIA_ Indicate mfttuos motritorinfvimW gi is esti to monitor the <br /> 490 51.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED <br /> Piping in the tank system is regulated under the UST law,or there is oro IVAIECTED TO THE TANK SYSTEM- Clack this box if no <br /> 490-52.v-99 OTHER_Indicate if anodur method is used foeP <br /> pipeline monitoring. <br /> 490-53.SPECIFY-Enter a brief description of the other line monitoring methods)used. If additional space is see Section X. Be sure o clearly describe <br /> monitoring method(s)and frequency. <br /> This monitoring plan mat include a Site Pian showing the genera!task and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor,line leak <br /> detector,monitoring system control panel,etc.). If you already have a d' (e.g.,current UST Monitoring Site Plan from a Monitoring System Certification form,Hazardous <br /> Materials Business Plan map,etc.)that slows all required infwmation,include it with this plan. <br /> UPCF UST-D(1212007)214 <br />