My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:10:43 PM
Creation date
6/3/2020 9:46:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR -01-2011 08:46 <br />G�• <br />anchoring system <br />Service Station Systems <br />E,1!23 E1&�-�a010 <br />Product penetration <br />fittings with secondary <br />hose termination <br />Patented float -trip shutoff <br />amplification mechanism <br />The B -2000's design assures lasting integrity', safety <br />and low-cost retrofitting when a chance in dispenser is <br />anticipated. <br />• U.L. listed system <br />Rugged steel construction <br />• <br />Factory pre -tested <br />• Fully equipped for contractor -friendly field installation <br />• <br />Compatible with all fuels <br />S. BRAVO SYSTEMS, INC - 2929 'Vail Avenue Commerce • CA • 90040 <br />Fax: 323/8$5-4123 • E-mail: info(u sbravn.com http://www,sbraao.corn <br />MM ECAOPWNT IV <br />Powder x y <br />p. <br />coated paint <br />1 1/2" single poppet - <br />product shear valve <br />,�n�•�•w •F 1y7,d <br />hv <br />a,'4 <br />Product valve brackets <br />The shalkiw "Bravo Box" is the world's first and foremost <br />secondary.;containment system for dispensers. <br />The•B-2t the original shallow Bravo Box, is factory <br />with the patented Float -Trip Amplification Mechanism <br />that shuts:down the impact valve of the product when approxi- <br />mately S;.obinces of fuel is captured .in the float reservoir. All <br />remitting dispenses, as well as the other• products in the leak- <br />ing dispemer continue in operation. <br />E,1!23 E1&�-�a010 <br />Product penetration <br />fittings with secondary <br />hose termination <br />Patented float -trip shutoff <br />amplification mechanism <br />The B -2000's design assures lasting integrity', safety <br />and low-cost retrofitting when a chance in dispenser is <br />anticipated. <br />• U.L. listed system <br />Rugged steel construction <br />• <br />Factory pre -tested <br />• Fully equipped for contractor -friendly field installation <br />• <br />Compatible with all fuels <br />S. BRAVO SYSTEMS, INC - 2929 'Vail Avenue Commerce • CA • 90040 <br />Fax: 323/8$5-4123 • E-mail: info(u sbravn.com http://www,sbraao.corn <br />MM ECAOPWNT IV <br />
The URL can be used to link to this page
Your browser does not support the video tag.