My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:10:43 PM
Creation date
6/3/2020 9:46:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR -01-2011 08:46 Service Station Systems <br />B=zou 0Tm <br />B P,.Avo B o xr <br />Optional fiberglass coating <br />Optional vapor recovery valve bracket <br />Optional Bravo vapor recovery valve <br />Optional factory vapor fitting; <br />Optional factory electrical fitting <br />with electrical seal <br />PRoDut: r FFATURFS: <br />• Made to spec for any brand or model of dis- <br />pe <br />• Low -cwt conversion frame allows <br />economical retrofi dn?, without removing existing <br />Bravo Box or breaking conovie, when dispenser <br />is upgraded. (optional) <br />• Standard steel frame functions as an anchorin; <br />platform and watergrard. <br />• UL listed powdcrepoxy coated steel. <br />• 12 -gauge eel. <br />• Patented. <br />SrANQARn FQulPMEN I. <br />• Patcrncd float -trip shutotl'amplification <br />mechanism. <br />• Product shear valve, single poppet <br />• Product shear valve bracket <br />• Product penetration fittings <br />• Powder epoxy coated paint <br />• 8.75" deep <br />Optional doable <br />poppet cheat- valve <br />Optional Flex Boot with glued <br />FRP pipe & UL epoxy coated <br />stainless steel clamps. <br />Third Party Approved and Tested <br />with Clamp Isolation System" <br />OPTIONAL, Eovit'MENT: <br />• BFH-3-30FRP-A or S Secondary flex <br />boot with Anicron or A.Q. Smith pipe <br />cued. (Third Party Tested) UL epoxy <br />crated stainless steel clamps <br />• B.I vapor rmwety shear valve <br />• BRKT-BI vapor recovery valve bracket <br />• FEF -ES -factory cicotrical fitting <br />with cicct7calst'Al <br />• FVF-NIP factory vapor fitting w/nipple <br />• DPA -double puppet shear <br />valve adder <br />• FC -fiberglass costing <br />• Conversion fratne <br />• Field installed vgvrand clec:trical penetration <br />fittings. <br />Arm connected to fusible link <br />of shear valve shun down <br />valve automatically <br />t.iptht num CSUSLS QOiftivC UCIUahOn IWAIMar <br />valve aflcr lvik ar aprproxitnately 5 oz. in <br />di%p enwr box <br />TOTAL P.03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.