Laserfiche WebLink
0 <br /> Monitoring System Certification-Page 2 of 3 RE( EIN/PD <br /> N I 2W <br /> Site Address: 2701 West March Lane Date of Testing/Servicing: 12/14/17 <br /> D. Results of Testing/Servicing ENVIRONMENTAL HE <br /> ID)FTARRTNIENT <br /> Software Version Installed. 331.00 <br /> Com lete the following checklist: <br /> 8 Yes [I No* Is the audible alarm operational? <br /> I Yes 0 No* Is the visual alarm operational? <br /> a Yes [I No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> 10 Yes [I No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> 0 Yes 0 No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem) <br /> I [I N/A operational? <br /> M Yes 0 No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> 13 N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down?(Check all that apply) M Sump/Trench Sensors; 13 Dispenser Containment Sensors. <br /> Did you confirm Eositive shut-down due to leaks and sensor failure/disconnection? M Yes Cl No <br /> N Yes 0 No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> 13 N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? 10 % <br /> 9 Yes* [2 No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below, <br /> 0 Yes* M No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> 0 Product;0 Water. If yes,describe causes in Section E,below. <br /> !14 Yes 11 No* Was monitoring system set-up reviewed to ensure proper settings? (Attach set-yMorts, ff applicable.) <br /> 2 Yes 0 No* Is a]I monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Replace TLS Battery for PM Purposes <br /> Replaced 91 STP Sensor(VR 794380-208)-Restested&Passed <br /> Replaced Disp 12-Diesel Bravo Float-Restested&Passed <br /> Adjusted Bravo Floats in 5/6 87 and 91,9110-91,11/12 87 and 91 -Retested&All Passed. <br />