Laserfiche WebLink
SWRCB,January 2002 Page > of c <br /> 5. SECONDARY PIPE TESTING <br /> 1 Test Method Developed By: b'Piping Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> /❑Other(Spec) <br /> Test Method Used: Q Isressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: �7 Equipment Resolution: r�dr� <br /> Piping Run# f Piping Run# Piping Run# Piping Run# <br /> Piping Material: _ <br /> Piping Manufacturer: <br /> Piping Diameter: r' r r t <br /> Length of Piping Run: >rR` l C) l'�� /��}f q��✓ °- (.1' 1 ` �_ ll C? <br /> Product Stored: <br /> Method and location of 4 W/"F'Sy �r� t 1,� ? � „ <br /> piping-run isolation: ar-tjig <br /> , � � �r�t���f� - ..�� -S< /� <br /> aha" � <br /> _ait time between applying / t I ' <br /> pressure/ acuum/water and <br /> tatting test: b 0! 0 I.r o G.,'e <br /> Test Start Time: <br /> Initial Reading(111): <br /> Test End Time: �� j y Z; 35 S-- <br /> Final Reading(RF): <br /> Test Duration: A"'I r-r — 04,,, 1 If 0 fe , <br /> Change in Reading(RF-RI): ) �°.�-- _ ,n 9.e j- <br /> Pass/Fail Threshold or <br /> Criteria: EF1 .I ;¢t ". <br /> Test Result: Pass O Fail Pass ❑Fail Pass ❑Fail IyPass H Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />