My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6230
>
2300 - Underground Storage Tank Program
>
PR0231225
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 11:53:20 PM
Creation date
6/3/2020 9:46:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231225
PE
2361
FACILITY_ID
FA0003624
FACILITY_NAME
CANEPAS CAR WASH
STREET_NUMBER
6230
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
08136003
CURRENT_STATUS
01
SITE_LOCATION
6230 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231225_6230 PACIFIC_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maintenance Inspecting/Verifying 95% Level (Without <br /> The 708-590 Series Overfill Prevention Valve has no Removing from Tank) <br /> periodic maintenance requirements. FOR DIMENSIONS"A" &"B": Refer to the"installation <br /> However, if the drop tube and valve assembly is removed record sheet"or re-measure and re-calculate per figure 1. <br /> from the tank(for inspection or service), inspect the <br /> drop tube seal for wear/damage(Figure 16). Replace if 1. Measure Dimension '7' (Figure 18) <br /> necessary. <br /> 6699 --] (Upper drop tube flange to <br /> _j edge of upper tube adapter) <br /> 2. Verify using the calculation below <br /> (Drop tube seal surface to <br /> "A" bottom of tank) <br /> -(Subtract) <br /> Drop Tube 'GB3$ (95%Volume from tank chart) <br /> (note orientation) E= <br /> -(Subtract) <br /> F45" (114mm) (95%Shutoff level offset) <br /> Figure 16:Inspect Gasket <br /> Additionally, if the upper or lower drop tube is (Equals) <br /> unthreaded/removed from the OPV,the O-ring(s)should <br /> be replaced (Figure 17). Same value as "Z" <br /> indicates correct installation <br /> Inspect O-ring <br /> Measure <br /> I T <br /> 416" <br /> (114 mm) <br /> Inspect 0-ring----P:���� <br /> Figure 17:Inpect O-Rings Figure 18:Dimension Verification After Installation <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.