Laserfiche WebLink
^ <br /> \/n <br /> V �^ <br /> Scope <br /> This procedure will provide a Veeder-Root ATG certified technician a procedure to safely testtank overfill <br /> Reference Documents <br /> ° VeedepRootTLS'3XXOperators Manual (57GO13'G1U) <br /> ° Veeder-RootTLS'3XXSetup Manual (57GD13'823) <br /> ° Vee6erRootTL8-45OSetup and Operation Screens Manual (577O18'A4C) <br /> " VmederRootTLQ'45UPLUS/TLS4Operator's Manual (577O14'11O) <br /> ° Vme6erRoctTLG4Quick Start(577O14-U84) <br /> ° yeedopRootOverfill Alarm Installation Guide(570O13'589) <br /> Consoles <br /> TL8'458PLU8.TLS4u.TLS4i.TLS'458and TL83XX <br /> Requirements <br /> TLS'45GPLUS.TUS4c.TLS4i.TLG'45D:Automatic Event:Device Task programmed totrigger onTank(]verfiUand <br /> close arelay feeding voltage tothe Overfill alarm device. <br /> TLS-3XX:Output relay programmed to close a relay on a Tank Overfill alarm feeding voltage to the Overfill alarm <br /> device. <br /> Testing Procedure <br /> 1. Inspection <br /> a Verify the levels inthe tank tomake sure there isproduct inthe tank and that the tank is enabled. <br /> b. If the site is currently receiving u delivery,wait until the delivery is complete. <br /> c. If the tank ieperforming aSLDtank test,stop the test. <br /> 2. Preparation <br /> e. Turn Alarm filtering off,as this will allow you huclear alarms quicker. Refer toTLS'3XX Setup manual <br /> (57GO13-623)orTLS4XKon-line help. <br /> b. Program Delivery delay to 1 minute,this will allow the delivery to be completed quicker. <br /> 1. Note the customers original value,onyou can restore itafter the test. <br /> 24 <br />