My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:43:38 PM
Creation date
6/3/2020 9:46:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aheftoff* Vag 9wonsoa <br />M <br />aw Ow9bee <br />Mot L. Ffoc*s <br />Sn 0. Most. t.t,o. <br />911an1 J, W <br />ry Anna Low <br />.s <br />Faetl i ty Name <br />,,e%ar J V tr L t ttCNt_ t t1 tJt J t t�t�, t `citYiN® <br />1601 East Hatstton Mom*. P. 0. Box 2M <br />Gly af Lodi <br />St ot% Callfwnla 95201 • r,ot.E <br />City of Oi4n A' <br />2M/48"781 city of Ripon <br />City of Stockton <br />Jopt Kh"na. M.O.. M.P.N.. Otoida Nsat1A ottic« city of Tracy <br />$ana.a JOA�ty <br />my <br />p1 �' <br />R <br />6YYtT t <br />,Oate of Inspection i a-- S -�$ Inspector <br />r-� <br />lTORING ALTERNATIVE 15 <br />Annual precision test on tank(s) and piping. <br />°;,; <br />Jr. to <br />rY `; iItatton-ut 5'su issiofth�` f i arterl stat "t�' g <br />11afict* with allowable variation. <br />Y ` ar�in 4 <br />leak .detectors on -pressurized. -piping.-_ <br />:F <br />tlyaoperational check of suction.pping function. <br />L, ell <br />Calibrated ureters for Inputs and .withdrawal s:: <br />eights and -ligasures sticker <br />rtification by qualified repairman <br />Implementation of this: sonitoring alternative requires that the following CIRCLED items <br />be completed by the specified dates. <br />1. Precision test(s)eastresults sv <br />• bort rtes to <br />this office within 30 days <br />Pipeline leak detectors must be installed on <br />pressurized piping pp�nQ,d, <br />03- Daily inventory reconciliation must be started imediately. with records maintained <br />at the facility for review. <br />4. Document daily check of suction piping function starting i_mme_diately. <br />5.� Submit quarterly statement to this office that allowable variation on inventory <br />reconciliation has not been exceeded or a list of dates and variations that <br />exceeded allowable.- The first statement is due by _ <br />Dispenser meter(s) must be calibrated by WJ �g l( d� with copy of <br />certification or Weights and Measures sticker number sutknittcd t this office. <br />If the above compliance dates cannot be met. contact this office prior to the specified <br />date. <br />If allowable daily inventory variation is exceeded. refer to Section 7644(f) for <br />rt~ uir�f1d actions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.