Laserfiche WebLink
a0AA0Of TaustfES <br />$6060® CarfbeAaon, pre•. <br />P•tricle E. vannuccl, Secy, <br />Anthaneffa Van Spronaen <br />Earl P(rnenlel <br />='ern 81job" <br />lanlel C. Flores <br />o. most. M.o. <br />Milli J. Wade <br />,i my Anna Cow <br />Facility Name <br />Date of Inspection <br />MONITORING ALTERNATIVE a7 <br />11 <br />1601 E831 Hatelton Avenue. P. 0. Box 2069 <br />S(ocktono1 <br />209/466-6781 <br />Joel Khanna. M.O.. M.p.M.• Olatrict Maalth ofllcw <br />0— <br />:1 <br />SERvoma <br />City Of Loa( <br />San Joaquin Counfy <br />C11y Of Eaca(on <br />City Of Manteca <br />City of Ripon <br />City of Stockton <br />City of Tracy <br />San Joaquin County <br />San Joaquin County <br />Inspector <br />f <br />Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br />where the Iigtfit: level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />L -Annual precision test on tank and piping. <br />✓Tank gauging performed as follows: <br />`'''Tank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />✓Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons. which <br />ever is less. between measurements. an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours. as per Article 5. Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />Precision tests) must be performed by ?and results <br />office within 30 days of the test. submitted to this <br />Tank gauging must be started immediately. (See instructions <br />above). <br />If the above compliance dates cannot be met, contact this office prior to thv specified <br />date. <br />4 1ot 11GT2 <br />