My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:43:38 PM
Creation date
6/3/2020 9:46:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />SITE HEALTH & SAFETY PLAN <br />A. OVERVIEW <br />This Project Health & Safety Plan delineates the basic <br />safety requirements for this project. <br />This project includes the scope of work for removal <br />and/or installation as described on the cover sheet of <br />this Project Health & Safety Plan. During the tank <br />removal project, soils from beneath the tanks will be <br />sampled for possible contamination. The soil samples <br />will be collected and analyzed for the possible presence <br />of migrating contaminants, including: TFHC (Total Fuel <br />Hydrocarbons) and BTX Compounds (Benzene, Toluene, and <br />Xylenes). <br />At the beginning of the project, ambient air samples <br />(background) will be taken with a Gastech LEL meter, set <br />forreading ppm range, to determine the presence or <br />absence of contamination. As the project continues <br />during the day, the personnel on site shall draw <br />periodic air samples to determine the possibility of <br />increases in airborne contamination. <br />The provisions set forth in this plan will apply as <br />minimum rules to be followed by the employees of Walton <br />Engineering, Inc., the Environmental Consultant Company <br />(listed on the cover sheet of this Project Health & <br />Safety Plan, and herein referred to as "Environmental <br />Consultant") and their subcontractors working on this <br />phase of the project. The subcontractors may elect to <br />modify these provisions, but only to upgrade or increase <br />the safety requirements, and only with the concurrence <br />of Walton Engineering, Inc.. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.