Laserfiche WebLink
E <br />SITE HEALTH & SAFETY PLAN <br />A. OVERVIEW <br />This Project Health & Safety Plan delineates the basic <br />safety requirements for this project. <br />This project includes the scope of work for removal <br />and/or installation as described on the cover sheet of <br />this Project Health & Safety Plan. During the tank <br />removal project, soils from beneath the tanks will be <br />sampled for possible contamination. The soil samples <br />will be collected and analyzed for the possible presence <br />of migrating contaminants, including: TFHC (Total Fuel <br />Hydrocarbons) and BTX Compounds (Benzene, Toluene, and <br />Xylenes). <br />At the beginning of the project, ambient air samples <br />(background) will be taken with a Gastech LEL meter, set <br />forreading ppm range, to determine the presence or <br />absence of contamination. As the project continues <br />during the day, the personnel on site shall draw <br />periodic air samples to determine the possibility of <br />increases in airborne contamination. <br />The provisions set forth in this plan will apply as <br />minimum rules to be followed by the employees of Walton <br />Engineering, Inc., the Environmental Consultant Company <br />(listed on the cover sheet of this Project Health & <br />Safety Plan, and herein referred to as "Environmental <br />Consultant") and their subcontractors working on this <br />phase of the project. The subcontractors may elect to <br />modify these provisions, but only to upgrade or increase <br />the safety requirements, and only with the concurrence <br />of Walton Engineering, Inc.. <br />1 <br />