My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:43:38 PM
Creation date
6/3/2020 9:46:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />SITE HEALTH & SAFETY PLAN <br />I. No excessive facial hair which interferes with a <br />satisfactory fit of the facepiece-to-face seal, will be <br />allowed on personnel required to wear respiratory <br />protective equipment. <br />J. All respiratory protection selection, use, and - <br />maintenance shall meet the requirements of established <br />procedures, recognized consensus standards (AIHA, ANSI, <br />NIOSH), and shall comply with the requirements set forth <br />in 29 CFR 1910.134. <br />K. Appropriate work areas for support, contamination <br />reduction, and exclusion will be established. <br />L. Walton Engineering, Inc. personnel on-site are to be <br />thoroughly briefed on the anticipated hazards, equipment <br />requirements, safety practices, emergency procedures and <br />communications methods, initially and in daily <br />briefings. <br />M. Contact with surface and groundwater shall be minimized. <br />N. Boots will be worn on-site at all times. <br />In addition, the following precautions shall be <br />implemented for all personnel working on the project <br />site: <br />Gross decontamination and removal of all personal <br />protective equipment shall be performed prior to exiting <br />the facility. Contaminated clothing will be removed and <br />collected in a drum for disposal. <br />The Project Superintendent will be responsible to take <br />necessary steps to ensure that employees are protected <br />from physical hazards, which could include, <br />Falling objects such as tools or equipment <br />Tripping over hoses, pipes, tools, or equipment <br />Slipping on wet or oily surfaces <br />Insufficient or faulty protective equipment <br />Insufficient or faulty operations, equipment, or <br />tools <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.