Laserfiche WebLink
11 <br />SITE HEALTH & SAFETY PLAN <br />I. No excessive facial hair which interferes with a <br />satisfactory fit of the facepiece-to-face seal, will be <br />allowed on personnel required to wear respiratory <br />protective equipment. <br />J. All respiratory protection selection, use, and - <br />maintenance shall meet the requirements of established <br />procedures, recognized consensus standards (AIHA, ANSI, <br />NIOSH), and shall comply with the requirements set forth <br />in 29 CFR 1910.134. <br />K. Appropriate work areas for support, contamination <br />reduction, and exclusion will be established. <br />L. Walton Engineering, Inc. personnel on-site are to be <br />thoroughly briefed on the anticipated hazards, equipment <br />requirements, safety practices, emergency procedures and <br />communications methods, initially and in daily <br />briefings. <br />M. Contact with surface and groundwater shall be minimized. <br />N. Boots will be worn on-site at all times. <br />In addition, the following precautions shall be <br />implemented for all personnel working on the project <br />site: <br />Gross decontamination and removal of all personal <br />protective equipment shall be performed prior to exiting <br />the facility. Contaminated clothing will be removed and <br />collected in a drum for disposal. <br />The Project Superintendent will be responsible to take <br />necessary steps to ensure that employees are protected <br />from physical hazards, which could include, <br />Falling objects such as tools or equipment <br />Tripping over hoses, pipes, tools, or equipment <br />Slipping on wet or oily surfaces <br />Insufficient or faulty protective equipment <br />Insufficient or faulty operations, equipment, or <br />tools <br />13 <br />