Laserfiche WebLink
SWRCB,January 2002 Page I-5-of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: U UDC Manufacturer U Industry Standard ofessional Engineer <br /> U Other(Spec) <br /> Test Method Used: U Pressure U Vacuum Hydrostatic <br /> U Other(Spec) <br /> Test Equipment Used:C­q.ti-AWe.1 Lev eL. TVi ca.-ay- Equipment Resolution: -t et tam <br /> UDC# a.- 2 UDC# 3 L UDC# 5Z tQ UDC# 17 G& <br /> UDC Manufacturer: "�rc� o (�rc�vG� 7701V/p <br /> UDC Material: S ( L CA4--e a 5 4-ef_L... $-e. Q..L <br /> UDC Depth: t c t e a <br /> Height from UDC Bottom to Top CF <br /> of Highest Pipjag Penetration: W p _C <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: $•e2.C-a k,� f��p yy { ,6o wi <br /> Condition of UDC prior to <br /> testing: Q✓ ✓ D <br /> Portion of UDC Tested'- <br /> ested U),Q LWtL y a <br /> Does turbine shut down when U yesNo U NA <br /> UDC sensor detects liquid(both U YesBio U NA U Yes o U NA U Yes 0 o U NA <br /> roduct and water)?` / 1 41 <br /> Turbine shutdown response time eJ fa- <br /> 1,11 A- <br /> Is system programmed for fail- U Yes U No <br /> safe shutdown?` t A U Yes U No JNA U Yes U No A11A U Yes U No/NA <br /> Was fail-safe verified to be U Yes U No IA operational?` .E U Yes U No A U Yes U No ^A U Yes U No NA <br /> Wait time between,a "ng <br /> pressure/vact unQa d <br /> starting test 1 0 vr\ C D ate. ¢ t p rYe <br /> Test Start Time: 5 : •1 , 2�15 �j o <br /> Initial Readin r : Pr v 4- G F-rY 4-Cry A4- ✓ -4— Crvolk <br /> Test End Time: to <br /> Fina!Readingfir✓ G�,-r a Csv"„- rvr�t �.ry 4-•CxVC1._ <br /> Test Duration: n vim,,u,�, 30 W p 3 U W <br /> Change in Reading RF-Ri): too N o C,•d.• _ No Com, <br /> Pass/Fail Threshold or Catena: ►-t, vt f U <br /> estt)€ '�tx U iax U l�allr'. * ss ";Ual ' ss 11 inlak .. <br /> Was sensor removed for testing? ayes U No U NA es U No U NA es U No U NA es UN U NA <br /> Cln cc w� G I o ea-4`5 <br /> Was sensor properly replaced and IX. Yes U No U NA es U No U NA (Yes U No U NA es U No U NA <br /> verified functional after testing? P( <br /> Yes <br /> - include information on re airs made prior to testing,and recarnmended ollow-u ar ailed tests <br /> -¢I 0"-.ew 47 <br /> t If the entire depth of the UDC is not tested,specify how much was tested. If the answer to Any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />