My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:08:30 PM
Creation date
6/3/2020 9:46:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_1997-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging SIR Equipment: 2r"Check this box if tank gauging is used only for inventory control. <br /> D Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> late the followi checklist- <br /> Lā <br /> D Yes Q No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes <br /> ā <br /> Yes Q No,* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> C3 Yes Q No* Was accuracy of system product level readings tested? <br /> C01 Yes Q No* Was accuracylof system water level readings tested? <br /> U Yes D No* Were all probes reinstalled properly? <br /> D Yes I Q No* Were all items on the equipment man uNcturer's maintenance checklist completed? <br /> *In the Section K below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): C1 Check this box if LLDs are not installed. <br /> Com olde the Mo " cbeckliaL, <br /> Yes Q No* For equipment start up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> Q N/A (Check all that apply) Simulated leak rate: Lf!rgp.h.; U 0.1 g.p.h; U 0.2 g.p.11 <br /> Yes Q No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes <br /> es Q No* Was the testing apparatits properly calibrated? <br /> UrYes 0 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Q N/A <br /> Q Yes Q No* For electronic LLDs,does the turbine automatically shut off if the LLD detocts a leak?. <br /> 2r'-N/A <br /> ED Yes U No* For electronic LLDs,does the tmbine automatically shut off if any portion of the monitoring system is disabled <br /> 2-N/A or discourtected? <br /> El Yes Q No* For electronic LLDs,does the turbine automatically slot off if any portion of the monitoring system ntaffituctions; <br /> eNIA or fails a test? <br /> Q Yes U No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> I I N/A <br /> ,ZYes 13 No* Were all item on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section K below,describe how and when these deficiencies were or will be corrected. <br /> ]EL Comments; <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.