Laserfiche WebLink
Adk <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone. (209)468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> WEST LANE FUEL 1 3300 N WEST LN STOCKTON July 25 2016 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 315 HSC 25291(e)Water in secondary containment not removed, analyzed, and properly disposed of(pre-Jul 2003). <br /> Water was found in the 87-submersible turbine pump (STP) sump. Secondary containment shall be constructed to <br /> prevent any water intrusion into the system by precipitation, infiltration, and surface runoff. The service technician <br /> removed approximately one gallon of liquid from the 87-product STP sump during the inspection. Continue to monitor <br /> the 87-product STP sump and if liquid returns, immediately contact a properly licensed, trained, and certified <br /> contractor to repair the 87-product STP sump. <br /> This was corrected on site. <br /> This is a minor violation. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the Environmental Health <br /> Department (EHD) with a statement documenting the corrective actions that have been or will be taken for each <br /> violation, and any supporting paperwork, by August 24, 2016. <br /> Please be aware that as of January 1, 2014, facility operators are required to upload the following UST program <br /> documents into the California Environmental Reporting System (CERS): UST Monitoring Site Plan, UST <br /> Certification of Financial Responsibility, UST Response Plan, UST Letter from Chief Financial Officer (if <br /> applicable), and the Owner Statement of Designated Operator Compliance. The UST Owner/Operator: Written <br /> Agreement, if applicable, can be stored at the facility or uploaded into CERS. <br /> Note: Immediately contact a properly licensed, trained, and certified contractor to repair/replace dispenser 5/6, <br /> that includes a Bravo conversion frame, under permit and inspection of the EHD. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING THIS <br /> FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> ei d by: ,Date: July 252016 Inspector: <br /> . y pe Inspector Phone: <br /> Printed Name and Title: VICKI MCCARTNEY, Senior REHS (209) 468-9852 <br /> Page 6 of 6 <br />