My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1301
>
2300 - Underground Storage Tank Program
>
PR0231342
>
COMPLIANCE INFO_1999-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 3:26:07 PM
Creation date
6/3/2020 9:46:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2009
RECORD_ID
PR0231342
PE
2361
FACILITY_ID
FA0000392
FACILITY_NAME
FLAMES LIQUOR
STREET_NUMBER
1301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
03104030
CURRENT_STATUS
01
SITE_LOCATION
1301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231342_1301 W KETTLEMAN_1999-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRODUCT PIPING SUMP TESTING <br />Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: o Pressure o Vacuum • Hydrostatic o Other (see below) <br />Measuring Equipment Used: INCON TS -STS (Electronic Sump Test System) <br />Description Tank #1 Tank #2 Tank #3 <br />Depth of water level from tank top (inches) <br />Comments: <br />Tank product Gasoline - 87 Gasoline - 91 Diesel <br />Sump material FRP FRP FRP <br />Sump diameter (inches) 42 42 42 <br />Sump depth (inches) 70 72 68 <br />Height from tank top to highest 14 15 16 <br />piping penetration (inches) <br />16 <br />21 <br />Height from tank top to lowest 17 18 17 <br />electrical penetration (inches) <br />0:05 <br />0:30 <br />Method of sump attachment to tank Tank Collar Tank Collar Tank Collar <br />Test start time <br />10:45 AM <br />Condition of sump prior to testing Dry Dry Dry <br />10:45 AM <br />Initial Probe Reading <br />Port <br />1.6119 <br />5.0771 <br />Test end time <br />11:01 AM <br />11:20 AM <br />11:01 AM <br />Final Probe Reading <br />4.8434 <br />1.5490 <br />5.0763 <br />Test duration (hr:min) <br />0:16 <br />0:15 <br />0:16 <br />Change in water level (t 0.0000 inches) <br />-0.0014 <br />-0.0629 <br />-0.0008 <br />Pass/Fail threshold (10.0020 inches Hr.) <br />0.0020 <br />0.0020 <br />0.0020 <br />TEST RESULT <br />PASS <br />FAIL <br />PASS <br />ion of sump tested <br />Entire <br />Entire <br />Entire <br />Is system programmed for fail-safe operation? <br />Unknown <br />Unknown <br />Unknown <br />Was fail-safe verified to be operational? <br />No <br />No <br />No <br />Was sensor removed for testing? <br />Yes <br />Yes <br />Yes <br />Was sensor properly replaced after testing? <br />Yes <br />Yes <br />Yes <br />Depth of water level from tank top (inches) <br />Comments: <br />Tank product Gasoline - 87 Gasoline - 91 Diesel <br />Sump material FRP FRP FRP <br />Sump diameter (inches) 42 42 42 <br />Sump depth (inches) 70 72 68 <br />Height from tank top to highest 14 15 16 <br />piping penetration (inches) <br />16 <br />21 <br />Height from tank top to lowest 17 18 17 <br />electrical penetration (inches) <br />0:05 <br />0:30 <br />Method of sump attachment to tank Tank Collar Tank Collar Tank Collar <br />Test start time <br />10:45 AM <br />Condition of sump prior to testing Dry Dry Dry <br />10:45 AM <br />Initial Probe Reading <br />Port <br />1.6119 <br />5.0771 <br />Test end time <br />11:01 AM <br />11:20 AM <br />11:01 AM <br />Final Probe Reading <br />4.8434 <br />1.5490 <br />5.0763 <br />Test duration (hr:min) <br />0:16 <br />0:15 <br />0:16 <br />Change in water level (t 0.0000 inches) <br />-0.0014 <br />-0.0629 <br />-0.0008 <br />Pass/Fail threshold (10.0020 inches Hr.) <br />0.0020 <br />0.0020 <br />0.0020 <br />TEST RESULT <br />PASS <br />FAIL <br />PASS <br />Depth of water level from tank top (inches) <br />Comments: <br />20 <br />16 <br />21 <br />Wait time for water level to stabilize (hr:min) <br />0:05 <br />0:30 <br />0:10 <br />Test start time <br />10:45 AM <br />11:05 AM <br />10:45 AM <br />Initial Probe Reading <br />4.8448 <br />1.6119 <br />5.0771 <br />Test end time <br />11:01 AM <br />11:20 AM <br />11:01 AM <br />Final Probe Reading <br />4.8434 <br />1.5490 <br />5.0763 <br />Test duration (hr:min) <br />0:16 <br />0:15 <br />0:16 <br />Change in water level (t 0.0000 inches) <br />-0.0014 <br />-0.0629 <br />-0.0008 <br />Pass/Fail threshold (10.0020 inches Hr.) <br />0.0020 <br />0.0020 <br />0.0020 <br />TEST RESULT <br />PASS <br />FAIL <br />PASS <br />© 2004 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.