My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1301
>
2300 - Underground Storage Tank Program
>
PR0231342
>
COMPLIANCE INFO_1999-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 3:26:07 PM
Creation date
6/3/2020 9:46:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2009
RECORD_ID
PR0231342
PE
2361
FACILITY_ID
FA0000392
FACILITY_NAME
FLAMES LIQUOR
STREET_NUMBER
1301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
03104030
CURRENT_STATUS
01
SITE_LOCATION
1301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231342_1301 W KETTLEMAN_1999-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY . <br />Test Method By: Q Manufacturer • Industry Standard 0:f <br />rofessional Engr. O Other (see below] <br />Test Method Uses:: ® PressureQ Vacuum 0 -Hydrostatic Q Other (see below} <br />Measuring Equipment Usdd'. Pressure Gauge (range0 to 10,psig) <br />Description P' o nq Ruh #'i Pipin-1 Rrun #2 Pring Run 43 <br />Pipe Manufacturer <br />Smith <br />Smith <br />Smith <br />Pipe TypeFRP <br />FRP <br />FRP <br />Primary Pipe Diameter (inches) <br />2" <br />2" <br />2" <br />Secondary Pipe Diameter (inches) <br />3" <br />3" <br />3" <br />Product Stored <br />Gasoline - 87 <br />Gasoline - 91 <br />Diesel <br />Method of secondary pipe isolationTermination <br />Boot <br />Termination Boot <br />Termination Boot <br />Location of secondary pipe isolation <br />sump <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />145' <br />135' <br />125' <br />(include length of branch runs) <br />Wait time for pressure to stabilize (hrmin) <br />0:25 <br />0:21 <br />0:17 <br />Test start time <br />8:30 AM <br />8:31 AM <br />8:32 AM <br />Initial pressure (psig) <br />5 <br />5 <br />5 <br />Test end time <br />9:30 AM <br />9:31 AM <br />9:32 AM <br />Final pressure (psig) <br />5 <br />5 <br />5 <br />Test duration (hours:minutes) <br />1:00 <br />1:00 <br />1:00 <br />Change in pressure (psig) <br />0 <br />0 <br />0 <br />Pass/Failthrreeshold (®psig) <br />0.5 <br />0.5 <br />0.5 <br />TEST RES V LT <br />PASS <br />PASS <br />PASS <br />Comments: <br />0 2002 Walton Engineering, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.