Laserfiche WebLink
0 0 RECEIVED <br /> SWRCB,January 2002 DECPdge 201, f <br /> Secondary Containment Testing Report Form PNV!€K-,.N!,�, NTAL <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. :_ TM T�AFNT <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: Flame Liquor&Gas Date of Testing: 11/27/2017 <br /> Facility Address: 1301 West Kettleman Lane,Lodi,Ca.95242 <br /> Facility Contact: Rupi I Phone: (209)334-3233 <br /> Date Local Agency Was Notified of Testing: 10/9/2017 <br /> Name of Local Agency Inspector(f present during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Afford-a-test <br /> Technician Conducting Test: Benjamin F.Duncan Jr./ICC#5246802-UT <br /> Credentials: X CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br /> License Type: A License Number: CSLB Lic.#341375/SWRCB Lic.490-1120 <br /> Manufacturer Trainine <br /> Manufacturer Component(s) Date Training Expires <br /> Caldwell Systems Piping Sum s/UDC's July 5, 2020 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> Annular Tank#1 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Annular Tank#2&3 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe #1 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe #2 X ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ <br /> Secondary Pipe #3 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump#1 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump#2 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump#3 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Dispenser Sump#1&2 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Dispenser Sump#3&4 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Dispenser Sump#5&6 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Dispenser Sump#7&8 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Test Fluid Supplied and recovered for reuse. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: lzsal�xnaaDate: November 27,2017 <br />