My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 4:05:16 PM
Creation date
6/3/2020 9:47:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eil <br />SWRC, January 2002 Page of <br />5. SECONDARY ST G <br />Test Method Developed By: Q Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: 0 Pressure ❑ Vacuum ❑ Hydrostatic <br />Other (Spec) <br />Test Equipment Used: Pressure Gauges <br />Piping Run# 87 Piping Run# 91 <br />p g <br />Piping Material: Fiberglass Fiberglass <br />Equipment Resolution;_ _ m <br />Piping Run# <br />DSL Piping Run# <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3 in <br />3 in <br />Length of Piping Run: <br />45 ft <br />45 ft <br />Product Stored: <br />Gas <br />Gas <br />Method and location of <br />i in -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />startin test: <br />n/a <br />n/a <br />n/a <br />n/a <br />-- <br />�--r---- <br />1 <br />Pass ❑ Pail <br />for failed <br />Test Start Time: <br />Initial Reading (R,): <br />9:00 a.m <br />5 psi <br />9:00 a.m <br />5 psi <br />Test End Time: <br />10:00 a.m <br />10:00 a.m <br />Final Reading (RF): <br />5 psi <br />5 psi <br />Test Duration: <br />1 hr <br />I hr <br />Change in Reading (R,: -j): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: Pass <br />Test Result: ® Pass 0 Fail <br />Comments —(include information an rennins made prior <br />Pass <br />0 Pass 0 Fail <br />to testing, and recommendedfollow-up <br />0 Pass 0 Pail <br />tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.