Laserfiche WebLink
L�] <br />QIMKMM�� <br />6. PIEPING SUMIP TESTING <br />L:1 <br />I est Metnod Developed By: 0 Sump Manufacturer 0 Industry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum R1 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: Incon Sump Tester <br />Equipment Resolution: <br />Sump # 87 Sump # 91 <br />Sump # 91 <br />Sump # SL Sump # <br />Sunip # DSL Sump # <br />Sump Di eters 48" <br />Sump Depth: <br />6511 <br />Sump Material: <br />FIBERGLASS <br />Height from Tank Top to Top of <br />Hi ohest Piin :, Penetration - <br />30)) <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />13" <br />Condition of sump prior to testing: <br />CLEAN <br />Portion of Sump Tested' <br />HIGHEST <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />roduct and water 9* <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes El No 11 NA <br />0 Yes DNo (03]'NA <br />Turbine shutdown response time <br />SECONDS- <br />AUTO <br />AUTO <br />Is system programmed for fail-safe <br />— <br />shutdown?* <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />D Yes 0 No DNA <br />0 Yes 0 No 0 NA <br />Was fail-safe verified to be <br />o erational?* <br />0 Yes 0 No 0 NA <br />DYes 13NO DNA <br />0 Yes 0 No DNA <br />0 Yes 0 No D NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />15 IN <br />test: <br />Test Start Time: <br />9:32 A <br />Initial Reading (Rj)-, <br />3.3396 <br />Test End The: <br />9:47 AM <br />Final Reading (RF), <br />3.3383 <br />Test Duration: <br />15 MIN <br />Change in Reading (RF -R'): <br />.0013 <br />Pass/Fail TIreshold or Criteria: <br />.002 <br />Test Result:0, <br />0 Pass 0 Fail <br />Pass 0 Fail <br />IZ Pass 0 Fail <br />0 Pass 0 Fail <br />Was sensor removed for testing? <br />OYes DiZ [INA <br />OYes 0 N DNA <br />E3Yes DNo DNA <br />0 Yes 0 No 0 NA <br />Was sensor properly replaced and <br />verified functional after test-- <br />R01 0 <br />Y o 0 <br />Y�es[3 Noll NA <br />0 Yes 11 No 0 NA <br />comBrits — (include infarrrtation on repairs rrtade prior to testing, and recaended failaw-up far failed <br />tests) <br />If the entire depth of the sump is not tested, specify how much was tested. I f thp nnQ%xu-r tn <br />