Laserfiche WebLink
DISCHARGE/LEAK DETECTOR' <br />CENTERLINE �°O"'"'O^n. <br />.nl Yf^NCS <br />LINE TEST PORT <br />A" NPT 5.80 <br />10.65" <br />SYPHON PORT <br />Ya" NPT <br />TANK PORT <br />Y4" NPT <br />RISER PIPE <br />4" NPT <br />RISER/COLUMN PIPE <br />CENTERLINE <br />1: D, <br />4 <br />10.45" <br />RISERICOLUMN PIPE <br />CF.NTERI INF <br />12.50" <br />LEAK DETECTOR <br />PORT - 2" NPT <br />DISCHARGE OUTLET <br />2" NPT <br />DISCHARGE/LEAK <br />DETECTOR <br />CENTERLINE <br />�@` SEW, L' <br />.,M) <br />y <br />Submersible Turbine Pump <br />Ordering Guide <br />GRADE LEVEL <br />PUMP HEAD •� • ' <br />CLEARANCE <br />BURY <br />DEPTH <br />A - <br />MODEL <br />LENGTH <br />OCT 18 2016 <br />ENVIRONMENTAL HEAL <br />PARTMENT <br />MANHOLE <br />LEAK <br />DETECTOR <br />TURBINE <br />MANIFOLD <br />El CONTAINMENT <br />SUMP <br />4" RISER PIPE <br />SUMP ADAPTER <br />TANK <br />MAN WAY <br />TANK INSIDE <br />DIAMETER <br />ACVI/IONS <br />r <br />i <br />z <br />0 <br />m U 0 m ^+ <br />n. C7ov5i�ai <br />z� �zpPQ� <br />< fi7 u oG v 4 <br />zwo= <br />tnz z� <br />y 0 � <br />A0 <br />O <br />PUMPMOTOR <br />a <br />U <br />(PMA) <br />X <br />y <br />C <br />LT -d <br />Q) z <br />-y o <br />1, <br />� a <br />BOTTOM <br />CLEARANCE <br />aa <br />5" TYPICAL <br />Notes: 1. Effective tank diameter (ETD) = Inside tank diameter (to top of 4" bung), including tank manway <br />N <br />and/or sump adapter. <br />2. Model length A = ETD plus riser length minus bottom clearance minus 1" thread engagement. <br />y O <br />-t 3 0 <br />3. Riser length (B) = Bury depth (to top of tank) minus pump head clearance minus tank manway <br />O t7 <br />" <br />and/or minus sump adapter. <br />p R <br />z <br />Ip <br />Q�FESSER <br />° <br />5 <br />/� <br />DRAWN <br />CHECKED <br />N lV <br />— <br />NO. 36475 <br />DA's <br />* EXP. 6-30-18 * <br />s 7 TITLE <br />C[T SHEETS <br />Cjujj. ¢ <br />OF 0F <br />JOBNuamE] <br />sltEEr <br />A2 <br />