My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 4:05:16 PM
Creation date
6/3/2020 9:47:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />11 <br />5. SECONDARY PIPETESTING <br />'rest Method Developed By: 0 Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br />C, <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum ❑ Hydrostatic <br />El Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolution: 0.5% of span <br />VNITMINEM <br />Piping Run 4 87 <br />Piping Run # 91 <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />100, <br />1001 <br />Product Stored: <br />Gasoline <br />Gasoline <br />Method and location of <br />iping-run isolation: <br />Reducer Boolstrittings <br />Reducer Boots/Fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />Test Start Time: <br />8:45 am <br />8:45 am <br />initial Reading (Rj): <br />5 psi <br />5 psi <br />Test End Time: <br />-- <br />9:45 am <br />9:45 am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />Test Duration: <br />I hr. <br />1 hr. <br />Change in Reading (RF -Rt}: <br />None <br />None <br />-Pa-ss/Fail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />Test Result* <br />[91 Pass —OFail <br />0 Pass 0 Fail <br />Comments — (ancltrc e anformataon on re airs made raor to testae , aradrecc�mmet�ded ollaw-za ter ailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.