Laserfiche WebLink
E <br />11 <br />5. SECONDARY PIPETESTING <br />'rest Method Developed By: 0 Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br />C, <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum ❑ Hydrostatic <br />El Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolution: 0.5% of span <br />VNITMINEM <br />Piping Run 4 87 <br />Piping Run # 91 <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />100, <br />1001 <br />Product Stored: <br />Gasoline <br />Gasoline <br />Method and location of <br />iping-run isolation: <br />Reducer Boolstrittings <br />Reducer Boots/Fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />Test Start Time: <br />8:45 am <br />8:45 am <br />initial Reading (Rj): <br />5 psi <br />5 psi <br />Test End Time: <br />-- <br />9:45 am <br />9:45 am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />Test Duration: <br />I hr. <br />1 hr. <br />Change in Reading (RF -Rt}: <br />None <br />None <br />-Pa-ss/Fail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />Test Result* <br />[91 Pass —OFail <br />0 Pass 0 Fail <br />Comments — (ancltrc e anformataon on re airs made raor to testae , aradrecc�mmet�ded ollaw-za ter ailed tests) <br />