Laserfiche WebLink
Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard [I Professional Engineer <br />0 Other (Specify) <br />Test Method Used: C) Pressure 0 Vacuum 0 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: Incon Sump <br />in=­­­ <br />Tester <br />STP Sump # 87 STP Sump # 91 <br />Equipment Resolution: 0,002" <br />Sump Diameter: <br />4F <br />42" <br />Sump Depth: <br />581) <br />58" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Pi in Penetration:. <br />22" <br />23" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />___ <br />191, <br />191, <br />Condition of sump prior to testing: <br />Good <br />Good <br />Portion of Sump Tested' <br />2" above piping <br />2" above piping <br />—Does —turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />0Yes 0No SNA <br />OYes ONo SNA <br />Turbine shutdown response time <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />shutdown?' <br />Oyes C]No ONA <br />0 Yes El No 0 NA <br />Was fail-safe verified to be <br />operational?* <br />0Yes 0No®NA <br />OYes []NoONA <br />Wait time between applying <br />pressure/vacuumlwater and starting <br />test: <br />30 minutes <br />30 minutes <br />Test Start Time: <br />9:06 am <br />9:06 am <br />Initial Reading (Rj): <br />5.5931 <br />5.9173 <br />Test End Time: <br />9:21 am <br />9:21 am <br />Final Reading (RF): <br />5.5928 <br />5.9179_ <br />Test Duration: <br />15 min. <br />15 min, <br />Change in Reading (RF -R,): <br />0.0003 <br />0.0006 <br />Pass/Fail Threshold or Criteria: <br />0.002" <br />+/-0.002" <br />Test Result- <br />0 Pass D Fail <br />M Pass 0 Fail <br />Was sensor removed for testing? <br />0 Yes 0 No 0 NA <br />0Yes 0No0NA <br />Was sensor properly replaced and 0 Yes 0 No [_-] NA 0 Yes 0 No 0 NA <br />verified functional after testi11 9 1 <br />UL-- <br />Comments — (include information on repairs niade prior to resting and recommended follow-yLorfailed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />If the entire depth of the sump is not tested, specify how much was tested. if the answer to an of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />