Laserfiche WebLink
Test Method Developed By: ❑ UDC Manufacturer 0 Industry Standard ❑ Professional Engineer <br />❑ Other (Sped) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/- 0.002" <br />EMEMEMEENIMEMEM Rim= <br />UDC #va <br />UDC Manufacturer: <br />Bravo <br />UDC Material: <br />Steel <br />UDC Depth: <br />12" <br />Height from UDC Bottom to Top <br />of Highest Pipjag Penetration: <br />Located on Bottom <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Located on Bottom <br />Condition of UDC prior to <br />testing: <br />Good <br />Portion of UDC Tested <br />2" above pipin& <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?' <br />D Yes ❑ No ®NA <br />Turbine shutdown re onse time <br />N/A <br />Is system programmed for fail- <br />safe shutdown? <br />❑ Yes ❑ No ® NA <br />Was fail-safe verified to be <br />operational?' <br />❑ Yes ❑ No ® NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />30 minutes <br />Test Start Time: <br />1:07 pm <br />Initial Reading (RI): <br />2.9252 <br />Test End Time: <br />1:22 pin <br />Final Readin (RF): <br />2.9252 <br />Test Duration: <br />15 min. <br />Change in Reading (RF -RI): <br />None <br />Pass/Fail Threshold or Criteria: <br />+/-0.00211 <br />Test Result: <br />El pass 0 :Fail <br />Was sensor removed for testin ? <br />❑ Yes 0 N 0 NA <br />Was sensor properly replacedand ®Yes ❑ No ®NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />Installed Conduit Boot in UDC # 7/8. <br />i If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />