My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 4:05:16 PM
Creation date
6/3/2020 9:47:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veeder-Root Line Leak Applin Guide <br /> WPLLD Precision Testing Frequencies <br /> On-Demand (D) <br /> Testing can be initiated manually through the TLS 350 Console or by programming a date and time into memory. <br /> Auto (A) <br /> Tests will run repetitively until a passing test is achieved.Once a passing test is achieved,testing will stop and recommence six <br /> months from the date of the last passing test. <br /> Monthly (M) <br /> Tests will run repetitively until a passing test is achieved.Once a passing test is achieved,testing will stop and recommence the <br /> first calendar day of the next month. <br /> Repetitive (R) <br /> Tests will run repetitively according to pre-programmed time intervals. <br /> Refer to the matrix below to determine which precision testing option best meets your needs: <br /> TESTING OPTION <br /> ULTIMATE TESTING D,M,R D,A,R <br /> RISK MANAGEMENT D,M,R D,A <br /> BASE COMPLIANCE NONE D,A <br /> WPLLD Accessories A Spare Parts for Existing TLS-350 Consoles <br /> The following WPLLD accessories and spare parts are available: <br /> MODEL <br /> 330020-290 WIRELESS REPLACEMENT TRANSDUCER FOR RED JACKET PUMPS <br /> 330020-291 WIRELESS REPLACEMENT TRANSDUCER FOR FE PETRO PUMPS <br /> 330773-001 SWIFTCHECK VALVE FOR WPLLD <br /> 330841-001 WPLLD CONTROLLER MODULE <br /> 330874-001 WPLLD AC INTERFACE MODULE <br /> 330883-001 WPLLD COMMUNICATIONS MODULE <br /> 330020-416 NON-VENTED SWIFTCHECK <br /> 330770-001 WPLLD SENSING LINE FOR FE PETRO PUMPS <br /> 330772-001 WPLLD SENSING LINE FOR RED JACKET PUMPS W/SWIFTCHECK <br /> 331069-001 WPLLD SENSING LINE FOR RED JACKET STANDARD PUMPS W/O SWIFT- <br /> CHECK <br /> 410138-001 WPLLD SENSING LINE FOR THE RED JACKET STANDARD PUMPS W/O <br /> SWIFTCHECK <br /> 330020-412 WPLLD INSTALLATIION ADAPTOR KIT FOR RED JACKET QUANTUM <br /> PUMPS <br /> 330020-477 WPLLD INSTALLATIION ADAPTOR KIT FOR RED JACKET PUMPS <br /> 330020-096 WPLLD INSTALLATIION ADAPTOR KIT FOR FE PETRO PUMPS <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.