Laserfiche WebLink
Veeder-Root Line Leak Applin Guide <br /> Special Installations <br /> Manifolded Line Applications <br /> DPLLD, PLLD and WPLLD leak detection systems can handle product lines supplied by multiple tanks and pumps,to a maxi- <br /> mum of 8 tanks and pumps per product line. <br /> Standard line leak sensing and check valve equipment should be installed at the primary pump. <br /> To perform 0.2 and 0.1 gph tests,a non-vented SwiftCheck valve(P/N 330020-416), or new Red Jacket 65 psi relief valve(P/N <br /> 410153-002),or SpikeCheck Valve Non-PSI Relief Valve for Standard Pump(P/N 410557-002), or FE Petro 65 psi Relief Check <br /> Valve(FE P/N 402459931)should be installed on each of the other pumps supporting the manifolded product line.The Non- <br /> Vented SwiftCheck Valve is rated to a maximum 70 gpm. <br /> •QNOTE: For 5 HP Maxxum pumps in diesel,an addtional in-line check valve with no pressure relief should be installed <br /> on the`Slave'pump to prevent backflow. <br /> A relay on a Four-Relay module or 1/0 Combination module(TLS-350 Series)or 1/0 Module(TLS-450 Series)must be available <br /> to control each secondary pump.The standard line leak modules will provide pump control output for the primary pump and the <br /> "Pump In"signal for the set. <br /> A typical manifolded line installation for DPLLD and PLLD is shown below: <br /> To Dispensers <br /> Flexible Pipe with <br /> Flexible Pipe with <br /> Swivel or Union Swivel or Union <br /> Ball Valve Ball Valve Non-Vented <br /> DPLLD or PLLD Sensor SwiftCheck <br /> SwiftCheck Valve Valve(if req'd.) <br /> Assembly <br /> O <br /> ❑ 1] <br /> Warning Tag Master Pump Slave Pump <br /> plld\mfdWks.eps Lower Numbered Tank Higher Numbered Tank <br /> Transducer Installation - Red Jacket CPT and Quantum CPT Pumps <br /> This installation procedure is to be used with Red Jacket CPT and Quantum CPT Pumps. <br /> 1. Install the Red Jacket CPT Transducer Adapter Kit(Red Jacket part number 144-326-5)following the instructions with the <br /> kit.Thread the PLLD transducer in the mechanical LLD port of the pump. <br /> Ai <br /> IMPORTANT!Seal any pipe threads using a UL-classified, nontoxic pipe sealant suitable for the fuel involved. <br /> The figure below illustrates two DPLLD and PLLD transducer installations in Red Jacket CPT pumps-consult"Check Valve <br /> Requirements"on page 6,to determine what check valve you will need to install to perform your intended level of testing. <br /> 2. Verify that the TLS-350 Series Console has Version x19 or later(TLS-450 Series Console has Version 1 or later)software. <br /> 3. Verify that the CPT Controller has Version 1.02 or later software installed. <br /> 11 <br />