My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 4:05:16 PM
Creation date
6/3/2020 9:47:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veeder-Root Line Leak Appliclin Guide • <br /> MAXXUM PUMPS <br /> 1. Thread the DPLLD or PLLD transducer into the 2-inch opening of the transducer port. <br /> ® IMPORTANT!Seal any pipe threads using a UL-classified,non-toxic pipe sealant suitable for the fuel involved. <br /> 2. If any in-line check valves or a Big-Flo Diaphragm Valve are installed in the line,they must be removed. <br /> 3. Verify that the TLS 350 Series Console has Version x19 or later software(TLS-450 Series Consoles Version 1 or later <br /> software). <br /> Junction box Seal-off,epoxy seal per NFPA spec <br /> (customer supplied) customer supplied) <br /> ( PP ) <br /> DPLLD or PLLD <br /> transducer 1 n 2" <br /> Transducer <br /> port <br /> 0 Q conduit to console <br /> (customer supplied) <br /> 0 <br /> O O <br /> plid\mamcum.eps <br /> FE PETRO HIGH CAPACITY PUMPS <br /> 1. Install a reducing tee(customer supplied)in either of the 3-inch discharge ports of the pump with the 2-inch port facing up. <br /> 2. Thread the D/PLLD transducer into the 2-inch port on the tee fitting. <br /> QIMPORTANT!Seal any pipe threads using a UL-classified,non-toxic pipe sealant suitable for the fuel involved. <br /> 3. Install a model"R"relief valve into the pump if one is not already present. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.