Laserfiche WebLink
i <br /> i <br /> I <br /> SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By:1 U Sump Manufacturer U Industry StandardFrofessional Engineer <br /> U Other(Spec) <br /> Test Method Used: U Pressure U VacuumFlydsostatic. <br /> I U other(SPedy') <br /> Test Equipment Used: C&(i j w+e11 �V-e 1 T,,�,"c e� Equipment Reso1ution:,t,,,& a4-t r, <br /> SUMP* SUMP#Z SUMP# � Sump# <br /> I <br /> Sump Diameter. 4(1e x e -i El e�ca o it t l <br /> kGc n <br /> Sump Material F l 6t*,?10 t S <br /> Height from Tank Top to Top of2 , Z 3 f ° <br /> Highest in Penetration• Z3 <br /> Height from Tank Top to Lowest 'S ° ) <br /> Electrical Penetration: i <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' j Wq,4-cY <br /> Does turbine shut down wh <br /> sump sensor detects liquid Zth `(res UNo U NA ,ATYes UNo U NA } Yes UNo U NA U Yes UNo U NA <br /> roduct and water?" j <br /> Turbine shutdowe response time 3 ge t• 7 ge C_ <br /> Is system programmed for fad safee$ U No U NA - <br /> shutdown?" Yes U No U NA , Yes U No U NA U Yes U No U NA <br /> Was fail-safe verified fobs es U No U NA <br /> ,es UNo UNA <br /> o ? ; , Yes U No U NA UyUNo U NA <br /> Wait time between ap ing <br /> pressure/n ater d surfing <br /> test: ! to o me 1b aM <br /> Test Start Time: (U!o J I O` y S l(.' 36 <br /> Initial Reading(R�. I !�� 7` / Fr�sf-Grw! ��rS4- Clyvtt. <br /> Test End Time: Iv!3t) t P S 'Z .a J <br /> Final Reading C,),- e r•s!-G�ut-e r✓ -�Gn G(P <br /> Test Duration:. j .3o 3o y+ 4-s 31)M rn <br /> Change in Reading(RF-Rz). N o e. <br /> NucA_ <br /> Pas&Tail Threshold or Criteria: <br /> Was sensor removed for testi�g? es UNo U NA Yes UNo U NA Yes UNo U NA U Y UNo U NA <br /> Was sensor properly�and yes U No U NA <br /> verified functional'} testiu ? es UNo U NA l es UNo U NA U es UNo U NA <br /> I <br /> Comments—(nqude kt;mation on repaars made prior to testing;and r rpmended Jollotwuu or ailed tests) <br /> j <br /> I <br /> i <br /> i <br /> °If the entire depth of the sump'is not tested,specify how much was tested. If the answer to ay of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",tfie entire sump must be tested. (See SWRCB LG-160) <br /> I <br /> I <br />