Laserfiche WebLink
SWRCB,January 2002 Page -5 of—7 <br /> 7. UNDER-DISPENSER CONTAINMENT(UD9 TESTING <br /> Test Method Developed By. U UDC Manuficturer U Industry Standard professional Engineer <br /> U Other(Specify) <br /> Test Method Used: U Pressure U Vacuum Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used-.Cit l dw e t l L-c"L 4 t e4WCj C� Equipment Resolution:101,41 AW1)A 214 h <br /> In EM <br /> UDC# 4-"L- UDC# 3 1 UDC#S f-i® UDC# 7 1Z <br /> UDC Manufactures. W es4vt", p niv lags t�),ts4e.*j 1 <br /> UDC Material: 1 ties P I.—$ ,� <br /> UDC Dettt: 9 ,0 <br /> Height from UDC Bottom to Top <br /> of Hi est Eift Penetration: loll-it <br /> Height from UDC Bottom to ND e l e CA ; (c u <br /> Lowest Electrical Penetration: PyR.-+rq4-)v, Pe4l t4d A-Jwt oAs <br /> Condition of UDC prior to <br /> testin : 17 r I ()V- ,- <br /> Portion ofUDC Tested' t1_1 a Wa L 112.1' Wq tWjcnn&1 1 1011 <br /> Does turbine shut down when �Q'Yes U No U NA <br /> UDC sensor detects liquid(both • \ ,d'i'es U No UNA i fes U No U NA es U No UNA <br /> product and water)?* \\ `� <br /> Turbine shutdown response time 3 Sx� . s,,�G • � <br /> Is system programmed for fail- es U No U NA <br /> safe shutdown?• Yes U No U NA1`Yes UNo U NA es U No UNA <br /> Was fail-safe verified to be es U No U NA U U } <br /> operational?" � acs UNo U NA es U No UNA <br /> Wait time between applying <br /> pressure/vacu d <br /> startin test S l <br /> Test Stasi Time: 9'o 9!!g5; 7!o U 8: S d <br /> Initial ReadingGorvSIL- e4'_r be <br /> Test End Time: 9!3 S 17!Z- 9!3e) <br /> Final Reading <br /> Test Duration: <br /> Change in geadin RI : iv o wa C1, r,Pass/Fail Threshold or Criteria: 1n0, ,,,. <br /> .... ..., .F, <br /> .. ............ ... <br /> Was sensor removed for testing? Yes U No U NA U No U � <br /> NA Yes U o U NAYrs U No U NA <br /> Was sensor properly replaced and ,kyes U No U NA ,\ es U No U NA es UNo U NA AYes U No U NA <br /> verified functional after testing? / <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for railed tests) <br /> {If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions,indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />