My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:27:51 PM
Creation date
6/3/2020 9:47:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 1 <br /> . <br /> WRITTEN MONITORING PROCEDURES <br /> PROGRAMM <br /> UNDERGROUND STORAGE TANK MONITORING <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> ting permit. The permit holder must notify San Joaquin County <br /> program are conditions of the opera <br /> (209) 468-3420 within 30 days of any changes to the monitoring <br /> Environmental Health Division, phone <br /> red to obtain approval before malting the change. <br /> procedures, unless requi <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> Facility Name <br /> Facility Address <br /> A. Describe the frequency of erforming the monito ' g. <br /> Tank <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank <br /> Piping <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): IC�C (CL <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> E. Reporting format for monitoring � v <br /> Tank <br /> Piping <br /> F. <br /> Describe the preventive maintenance schedule for the monitoring equipment <br /> schedule <br /> . Note- <br /> Maintenance must be in accordance with the manufacturers maintenance <br /> but not less than every 12 months: <br /> G. <br /> Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.