My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:27:51 PM
Creation date
6/3/2020 9:47:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK # <br />INFORMATION • <br /># <br />Z <br />UST <br />SYSTEM DRAWING <br /># <br />CAPACITY <br />ld 000 <br />j vt-0 <br />1. <br />MANUFACTURER <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2.� <br />Plans drawn to scale in non -erasable print. <br />3. <br />N/ <br />Plot plan to show location of tanks and all associated piping. <br />4. <br />_�% <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />6r `) '.� I <br />5. <br />✓ <br />Tank cross-sectional diagram. <br />6. <br />✓ <br />Detail of tank, associated piping, excavation and cover. <br />7. <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />Article 3, Section 2631 (b) & 26351 <br />8. <br />t7(4 G <br />Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />L <br />"'� &e? <br />9. <br />(/ <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />At the installation site, prior to installation, a tightness test shalt be performed on both primary <br />(10) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)) <br />11. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />_� <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />17 <br />TAUV f'fW0nC1TTMI <br />TANK # <br /># <br />+ <br /># <br />Z <br /># <br /># <br /># <br />CAPACITY <br />ld 000 <br />j vt-0 <br />MANUFACTURER <br />,�? <br />M0 6/ZN <br />c <br />J;r645L <br />TEE L <br />MODEL <br />6r `) '.� I <br />Cg S 3 <br />PRODUCT <br />A'j <br />CORROSION PROTECTION <br />U.L. LISTED <br />t7(4 G <br />7 (� <br />COMPATIBILITY WITH 1OOe <br />METHANOL <br />L <br />"'� &e? <br />qes <br />13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank [Section 2635 (a) (2) (A)) <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.