Laserfiche WebLink
SWRCB,January 2002 Page Of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer X Industry Standard 0 Professional Engineer <br /> [I Other(Specify) <br /> Test Method Used: X Pressure [I Vacuum 0 Hydrostatic <br /> E)Other(Specify) <br /> Test Equipment Used: Psi Gauges Equipment Resolution: <br /> W, .... ........ <br /> mo W. , ..............•.. • • <br /> ....... Piping Run#87 Piping Run#91 • <br /> Piping Run#Dsl• Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: UK UK UK <br /> Piping Diameter: 319 399 399 <br /> Length of Pining Run-. 3099 2699 4099 <br /> Product Stored: 87 91 Dsl <br /> Method and location of Boot in Sump Boot in Sump Boot in Sump <br /> -piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 0 0 0 <br /> starting test: <br /> Test Start Time: 11:00 am. 11:00 a.m. 11:00 am. <br /> Initial Reading(R,): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 11:30 a.m. 11:30 a.m. 11:30 am. <br /> -Final Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: 30 min. 30 min. 30 min. <br /> -Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: X Pass 0 Fail A Pass , 0 Fail X Pass 0 Fail 0:Pass:�, 0.Fail <br /> -Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />