My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:39:04 PM
Creation date
6/3/2020 9:47:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page Of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer X Industry Standard 0 Professional Engineer <br /> [I Other(Specify) <br /> Test Method Used: X Pressure [I Vacuum 0 Hydrostatic <br /> E)Other(Specify) <br /> Test Equipment Used: Psi Gauges Equipment Resolution: <br /> W, .... ........ <br /> mo W. , ..............•.. • • <br /> ....... Piping Run#87 Piping Run#91 • <br /> Piping Run#Dsl• Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: UK UK UK <br /> Piping Diameter: 319 399 399 <br /> Length of Pining Run-. 3099 2699 4099 <br /> Product Stored: 87 91 Dsl <br /> Method and location of Boot in Sump Boot in Sump Boot in Sump <br /> -piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 0 0 0 <br /> starting test: <br /> Test Start Time: 11:00 am. 11:00 a.m. 11:00 am. <br /> Initial Reading(R,): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 11:30 a.m. 11:30 a.m. 11:30 am. <br /> -Final Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: 30 min. 30 min. 30 min. <br /> -Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: X Pass 0 Fail A Pass , 0 Fail X Pass 0 Fail 0:Pass:�, 0.Fail <br /> -Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.