My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:39:04 PM
Creation date
6/3/2020 9:47:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page Of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer X Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Incon TS-STS Equipment Resolution: <br /> .......... 'M <br /> Sum 87 Sump# Sump# Sump# <br /> Sump Diameter: 48" 4891 4899 <br /> Sump Depth: 4299 4791 47" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 22" 2419 22" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 1699 19" 1891 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> -Portion of Sump Tested' 2"Above pipng 211 Above pipng 2"Above pipng <br /> Does turbine shut down when <br /> sump sensor detects liquid(both []Yes ONo XNA OYes DNo XNA []Yes ONo XNA 0 Yes 0 No 11 NA <br /> -product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe 0 Yes 0 No X NA 0 Yes 0 No X NA 0 Yes 0 No X NA 0 Yes 0 No 0 NA <br /> shutdown?* <br /> Was fail-safe verified to be 0 Yes 0 No X NA 0 Yes 0 No X NA 0 Yes 0 No X NA 0 Yes 0 No 0 NA <br /> I-operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 3 min. 3 min. 3 min. <br /> test: <br /> Test Start Time: 2:13 p.m. 2:13 p.m. 2:13 p.m. <br /> -Initial Reading(Ri): 4.8320 4.1567 4.3459 <br /> Test End Time: 2:28 p.m. 2:28 p.m. 2:28 p.m. <br /> Final Reading(RF): 4.8321 4.1560 4.3457 <br /> Test Duration: 15 min. 15 min. 15 min. <br /> Change in Reading(RF-Rj): .0001 .0007 .0002 <br /> Pass/Fail Threshold or Criteria: .002 .002 .002 <br /> Test Result: X Pass D Fail X Pass. 0 Fail X Pass 0 Fail -0 Pass 0 Fail <br /> Was sensor removed for testing? X Yes 0 No 0 NA X Yes 0 No 0 NA X Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> Was sensor properly replaced and X Yes 0 No D NA X Yes 0 No 0 NA X Yes 0 No 0 NA 0Yes 0No DNA <br /> verified functional after testing? I <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to an of the questions indicated with an <br /> asterisk(*)is"NO"or"NN',the entire sump must be tested. (See SWRCBLG-l60) <br />
The URL can be used to link to this page
Your browser does not support the video tag.