Laserfiche WebLink
0 <br /> 9. Will there be striker plates or drop tube-mounted protectors <br /> below all accessible openings? If so, please illustrate. <br /> 10. You have identified that the tanks will be tested using an electric resistance <br /> holiday detector at the installation site, and a vacuum will be applied to the <br /> interstitial space, is this true? <br /> 11. What is the turbine containment vessel constructed of? <br /> 12. Please submit a copy of the installation procedures for the Glassteel 11 <br /> underground storage tank. <br /> 13. Will the probe in the dispenser pan shut off the pumping system to all three <br /> tanks when a release is detected and when the continuous monitoring system <br /> fails or is disconnected? <br /> 14. You have identified the Incon TS-1000/4EFI as the monitoring console and <br /> associated liquid probes for the piping and the sumps. All proposed leak <br /> detection equipment must meet the requirements specified in 40 CFR 280.40 <br /> and have been reviewed by the State Water Resources Control Board <br /> (SWRCB) Staff. There are no approved liquid-phase interstitial detectors <br /> approved by the SWRCB staff for Incon Environmental Inc. Please supply <br /> SWRCB approval to this office for the Incon TS-1000/4EFI liquid probes or <br /> choose equipment approved by the SWRCB staff. <br /> 15. What is the Amcon Probe used for? <br /> 16. Will the Total Containment secondary pipe be used for the secondary <br /> containment? If so, please submit evidence of UL approval. <br /> 17. Are you proposing to install Total Containment dispenser sumps or Amcon <br /> Elite dispenser drip pans? <br /> If you have any questions please call me at (209) 468-0333. <br /> Thank you for yow cooperation, <br /> Eric Trevena, Senior R.E.H.S. <br /> enclosure <br />