My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231382
>
COMPLIANCE INFO_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 8:56:06 PM
Creation date
6/3/2020 9:48:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997
RECORD_ID
PR0231382
PE
2361
FACILITY_ID
FA0004139
FACILITY_NAME
Plaza liquor and Gas
STREET_NUMBER
2420
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
2420 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231382_2420 W TURNER_1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-26-1997 9:53AM FRO P. G <br /> UST SYSTEM DRAWINC INFORMATION <br /> 1. X Three Complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2- Plans drawn to scale in non-erasable print. <br /> 3. _2L Plot plan to show Location of tanks and all associated piping. <br /> 4, Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> S. - , Tank cross-sactlonal diagram. <br /> 6. Oetail of tank, associated piping, excavation and cover. <br /> 7. Tank(g) and piping approved by a nationally recognized independent testing organization. (Titte 23, Chapter 16, <br /> Article 3, Section 2631 (b) b 26353 <br /> E. verification of product compatibility with tae tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the instatlation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (e) containme, t systems before covering. CSection 2635 (a) (3) & (4)I <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-END from the testing company or owner of facility. (Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)3 <br /> 12. TANK COMPOSITION <br /> TANK M t # !! * # <br /> CAPACITY ( i <br /> MANUFACTURER hftft a <br /> COMPOS(TION ` !� ,' <br /> =SL �1 - <br /> PRODUCT � <br /> CORROSION PROTECTION yfs <br /> 1 U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> METHANOL <br /> 13. TANK(s) TO 66 INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metaltic exterior <br /> coatings or coverings. <br /> (1) Tested at the instalLatictl site using an electric resistance holiday detector. <br /> (2) vacuum applied to interstitial space. <br /> ® a. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) vacuum applied to interstitial space. <br /> ® (3) Hydrostatie annular (primary tank pressure test). <br /> C. Non-ctad steel tank CSection Z635 (a) (2) (A)3 <br /> (1) Cathodie protection provided for entire tank, piping and components (nuns, bolts, washers, <br /> etc-). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less then every 60 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.