Laserfiche WebLink
Qi !7,:t. 9..FiC . L D <br /> modern m in Vt dng,CC�Ir APP <br /> FABRICATORS OF METAL PRODUCTS ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> T PROCEM R A F A R N <br /> QRAGE _TANKS <br /> CAUT 1 ON : N ,F, f?. AI -3O : j l QdTNSSS TIST i NQ REQUIREMENTS : IT IS THE <br /> RESPONSIBILITY OFTHE OWNER TO PROVIDE THE FOLLOWING TESTS <br /> PRIOR TO COVERING THE TANK ( S . ) <br /> N , F . P . A . - 3o : 2- 8 . 3 : 1 - SECONDARY CONTAINMENT TANKS ( TYPE I AND <br /> 11 ) SHALL HAVE THE PRIMARY ( INNER ) TANK TESTED ACCORDING TO <br /> 2 - 8 . 3 AND THE INTERSTITIAL SPACE ( ANNULUS ) TESTED USIN0 . . . OR <br /> VACUUM AT 5 . 3 IN . HO . THE . . . VACUUM SHALL BE HELD FOR ONE <br /> VACUUM . HOUR . CARE SHALL BE TAKEN TO ENSURE THAT THE <br /> INTERSTITIAL SPACE IS NOT OVERPRESSURED OR SUBJECTED TO <br /> EXCESSIVE VACUUM . " <br /> N . F . P . A . - O : " BEFORE THE TANK IS INTIALLY PLACIED IN <br /> SERVICE . ALL LEAKS SHALL BE CORRECTED IN AN ACCEPTABLE MANNER . " <br /> N . F . P . A . - 31 " STANDARD FOR INSTALLATION, OF OIL BURNING SOUIPMENT . <br /> ldQL.E S 1 29S FOR I STAt I AT 1 Ohl OF T6bIK5 IN S-T SOIL GOND ! T B C}�IS_i <br /> E116IL EB I <br /> 1 . THE EXCAVATED OPENING FOR INSTALLATION OF UNDERGROUND TANK($ ) SHALL Bt; <br /> SUITABLY EXCAVATED (REFER TO OSHA. STATE. OR LOCAL CODES GOVERNING <br /> OPENINGS . ) LEVELED AND BACKFILLED PER THE FOLLOWING INSTRUCTIONS . <br /> 2 . REFER TO THE "FINISHING INSTRUCTIONS' FOR SPECIAL REOUIRMENTS PRIOR TO <br /> BURIAL OF -aLABTEEL," TANKS . <br /> 3 . TANKS SH>LL BE COMPLETLY EMPTY DURING HANDLING OR INSTALLATION TO PREVENT <br /> UNDUE STA98S TO THE TANK( S . ) <br /> 4 . IN THE EVENT A TANK =ZX BE INSTALLED . FILLED WITH PRODUgTS . PR1tiR TO <br /> BACKFILLING, THE LIQUID LEVEL WITHIN THE TANK SHALL NOT EXCEED THE %®OMPACTED <br /> BACKFILL LEVEL . <br /> Off! TE`A' THE FOVNOATION FOR UNDERGROUND TANK($) <br /> MPAtT &IT SHALL 8E A MINIMUM OF B' Ct,E/aN <br /> COMPACTED SAND. OR O' OF 304' PISA <br /> '1 Y� •I t •t `t 47 t lY 1•/ S 1 GRAVEL. <br /> NOTE-B1' TANK($) INSTALLED IN AN AREA THAT IS <br /> SUROECT TO HQAVY VEHICULAR TRAFFIC <br /> CLEAN COMPACTPROTECTIVE <br /> D SOIL 1 WITH EITHER a" <br /> OF REINFORCED CONCRETE. OR o' OF <br /> ASPHALT PAVING. IF COMPACTED SOIL IS- <br /> -TO BE THE ONLY COVER IT SHALL BE A <br /> c� MINIMUM OF 36' DEEP. <br /> GAMM Ncr9.12 TANK($) INSTALLED IN AN AREA NOT <br /> SUBJECT TO HEAVY VEH I CVLAR TRAFFIC <br /> c>�ca SHALL BE PROTECTED WITH EITHER 24' OF <br /> CLEAN COMPACTED 2011. COVERED QY A, <br /> THICK REINFORCED CONCRETE OR S' THICK <br /> ASPHALT PAVING. <br /> 'CI ' JIMILF, TANK IN TION: MINIMUM OF <br /> 12' FROM THE OUTSIDE BOISE OF TANK TO <br /> THENINSIDE EDGE OF THE EXCAVATED <br /> NOTE'22' MULTIPLE TANK INSTALLATION: SAME ED®E <br /> DISTANCES AS SINQLE TANK INSTALLATION. <br /> AND A MINIMUM OF 12" FROM OUTSIDE <br /> BOOM OF THE TANKS. <br /> � NdTE'D• THE MINIMUM DISTANCE FROM THE OUTSIDE <br /> NQTE'CZ'' ENDS OF THE TANK($) TO THE INSIDE ED®C <br /> —LLNDTLr•o• OF THE OPENING SHALL BE A MINIMUM O► <br /> PLAN AT AULT I PLE TANK I NNTALL.AT:ON 12' <br />